(1): Job JSR0159 Route 52 BATES County. Resurface from I-49 North interchange to I-49 South interchange in Butler, the total length of improvement being 1.849 miles.
(2): Job JSR0308 Route 18 BATES County. Resurfacing from Route Y near Merwin to I-49 in Adrian, the total length of improvement being 14.103 miles.
(3): Job JSR0309 Route LP 49 BATES County. Resurface and add shoulders from Route F in Passaic to Route 52 in Butler, the total length of improvement being 4.53 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
The contract includes three jobs: Job JSR0159 on Route 52 involves resurfacing 1.849 miles from the I-49 North interchange to the I-49 South interchange in Butler, including coldmilling, asphalt concrete overlay, pavement markings, guardrail, and signal work. Job JSR0308 on Route 18 involves resurfacing 14.103 miles from Route Y near Merwin to I-49 in Adrian, including surface leveling, coldmilling, pavement markings, and guardrail. Job JSR0309 on Route 49 involves resurfacing and adding shoulders on 4.53 miles from Route F in Passaic to Route 52 in Butler, including coldmilling, asphalt concrete overlay, shoulder rumble strips, and guardrail. The work also includes mobilization, surveying and staking, and traffic control.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-G06), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.