(1): Job JNE0142 Route 6 ADAIR County. Bridge removal over abandoned railroad on Route 6 in Kirksville, the total length of improvement being 0.038 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
Remove 146-foot Bridge A2901, existing pavement, guardrail, miscellaneous concrete and 36-inch concrete pipe; perform clearing and grubbing, Class A and Class 3 excavation, embankment placement and compaction, subgrade compaction, Type 1 aggregate base and gravel shoulders, and asphaltic concrete paving; install 206 feet of 36-inch Group A pipe with flared end sections and rock lining; and complete construction signing, pavement marking, temporary traffic control with detour and bridge closure, erosion control, seeding and mulching, and contractor-furnished surveying and staking.
We post new structural work opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-B03), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.