(1): Job JNE0101 Route 15 KNOX, SHELBY County. Seal coat from Route 6 north junction at Edina to Route 168 in Shelbyville, the total length of improvement being 31.9 miles.
Bid opening: 12/18/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes emulsified asphalt seal coat, Grade A2 seal coat aggregate, contractor-furnished changeable message sign without communication interface, lump sum temporary traffic control and mobilization, and white and yellow Class 1 pavement marking paint, plus logging existing markings, blocking bridge deck drains, protecting priority water at Bridge H0770, work zone traffic management and contractor quality control, on Route 15 from Edina to Shelbyville for 31.9 miles.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261218-B02), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.