(1): Job JSE0106 Route BU67 BUTLER County. Bridge deck replacement over Pike Creek, the total length of improvement being 0.063 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes removal of the existing bridge deck, furnishing and placing slab on steel, bridge approach slab, concrete approach pavement, A2 shoulder, guardrail (MGS guardrail, MGS bridge approach transition section, Type A crashworthy end terminal), rock blanket (furnishing and placing Type 2 rock blanket), permanent erosion control geotextile, porous backfill, removal of improvements, mobilization, contractor furnished surveying and staking, seeding (cool season grasses), mulching, rock ditch check, sediment removal, temporary seeding, silt fence, Type C berm, temporary traffic barrier, relocating temporary traffic barrier, temporary removable marking tape, pavement marking paint, pavement marking removal, impact attenuators, replacement sand barrels, construction signs, channelizers, direction indicator barricades, flashing arrow panel, non-destructive testing, shear connectors, slab drains, vertical drains at end bents, and protective coating for concrete bents and piers.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-H11), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.