We'll email you new asphalt opportunities in Missouri as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The U.S. Army Corps of Engineers, Kansas City District, Intends to issue an invitation for bid (IFB) solicitation for construction activities for storm sewer separation and improvements. The work covered by this contract consists of furnishing all equipment, labor, operators, supervision/ site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform related work, including pavement, sidewalk, driveway, and parkway restoration. RTA Plans and Specs have been included as separate attachments. * The Supplemental Bid Schedule Attachment has been added.
Furnish all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials and incidentals to construct new and improved storm sewer and related work including pavement, sidewalk, driveway and parkway restoration. CLIN 0001 covers the 16th Street Alignment including removal, sewer pipe and drainage structure/junction box installation, erosion control, curb and gutter, street and driveway, seed and sod, sidewalk, and outfall structure to White Clay Creek. CLIN 0002 is an option covering the 15th Street Alignment including traffic control and protection and similar sewer and restoration items.
"64106-2896""KANSAS CITY""MO""USA""CONTRACTING DIV CORPS OF ENGINEERS""601 E 12TH ST""503708_ATCH_CSO_RTA_SPECS.pdf"25568695"file"".pdf""1""2026-10-19T13:57:57.089+00:00""9f9c34f491344fab98cf6d03e52614ee""public""0""public""338eb7e18f1f4c73bf0555d3a93bb66b""0"4"0""Update 9001 Atchison CSO Supplemental CLIN Schedule V2.xlsx"12936"file"".xlsx""1""2026-10-19T20:46:48.128+00:00""18f45ee744924710a8ad673d5de28961""public""0""public""e64e85b509444cf49a4f38e7e6ae34a4""0"3"0""2026_09_21_503708_ATCH_CSO_RTA_PLANS.pdf"83368653"file"".pdf""1""2026-10-19T13:57:57.089+00:00""79a089d46a3548c2b40067104ee47621""public""0""public""162a0dcce8f24646abaa4ef3e7a16613""0"2"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DQ27BA002¬iceType=SolicitationNotice"0"link""1""2026-10-13T18:41:06.906+00:00""8f18c6533346479db2f9d62758b41926""public""0""PIEE Solicitation Module Link for W912DQ27BA002""public""1837795961a5466698a3db263dc7eb1e""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-13T18:41:06.906+00:00""07ed9869210e42c59fabece7afd39938""public""0""Web Based Training for the PIEE Solicitation Module""public""f5f0d307766f45d1918c5b76782f9239""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-13T18:41:06.906+00:00""a37f92f33f9a401eb02e80828df2e4bd""public""0""Registration Instructions for the PIEE Solicitation Module""public""cfefe8f3e7c046b8a452a8d67dfcc1cb""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-13T18:41:06.906+00:00""958de26e812e4e508e7108b03e54063e""public""0""Department of Defense Procurement Toolbox""public""13b4011ae51544f6a0f41617b9b351ad""0"1"0"Most Missouri work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 138acbd4d5ec4d6e8f278b0ebcf76f2b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.