(1): Job J9S3811 Route N SCOTT County. Resurface from Route E to Route D near Charleston, the total length of improvement being 10.07 miles.
(2): Job J9S3827 Route A SCOTT County. Resurface from Route 77 in Chaffee to Route 61, the total length of improvement being 8.997 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
The contractor furnishes all labor, materials, equipment and services to resurface Route N and Route A with plant mix bituminous surface leveling PG64-22, tack coat including non-tracking tack, cold milling and modified cold milling, permanent aggregate edge treatment, pavement marking paint and preformed thermoplastic markings, MGS guardrail with transitions and Type A crashworthy end terminals and modified shaping slopes, partial removal of two tube rail and seal coat aggregate work on Bridge A64511, removal of improvements, and work-zone traffic control with construction signs, channelizers and changeable message signs.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-H09), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.