(1): Job JSR0083 Route F GREENE County. Bridge replacement over Sac River, the total length of improvement being 0.1752 miles.
(2): Job JSR0136 Route 160 GREENE County. Culvert replacement over Hamilton Creek between Thurmond Avenue and Perryman Avenue in Ash Grove, the total length of improvement being 0.0781 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
Job JSR0083 (0.1752 miles) replaces Bridge K0646 with four-span Bridge A9077 using NU 53 prestressed concrete girders, drilled shafts, rock sockets, galvanized HP piles, Class B substructure concrete, barriers, approach slabs and MGS guardrail with crashworthy terminals, plus grading, aggregate base, optional asphalt or concrete pavement, rumble strips, signing, pavement marking, drainage, rock blanket and erosion control. Job JSR0136 (0.0781 miles) replaces the Hamilton Creek crossing with a precast double 10-foot by 4-foot box culvert including Class 4 excavation, dewatering, Class B-1 concrete, reinforcing steel, grading, aggregate base, bituminous mixture, tack, coldmilling, curb and gutter, sewer pipe and manholes, signing and pavement marking, with traffic management and water-pollution controls.
We post new structural work opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-G08), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.