(1): Job J7S3506B Route 96 JASPER County. ADA improvements from west of I-49 to Route 571 in Carthage, the total length of improvement being 0.9 miles.
(2): Job JSR0060 Route 96 JASPER County. Pavement replacement and culvert rehabilitation from I-49 to Route 571 in Carthage, the total length of improvement being 1.018 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
The work includes full-depth pavement reconstruction, utility relocations, storm sewer installation, sidewalk and ADA curb ramp upgrades, signalization, permanent signing, and pavement markings along Route 96 (Central Avenue) from Sta. 443+50 to Sta. 507+25 in Carthage, Jasper County. It also includes the construction of concrete pavement, asphaltic concrete pavement, curb and gutter, sidewalks, curb ramps, traffic signals, lighting, signing, guardrail, water main construction, and bridge work on Bridge L0414. The project is divided into multiple phases with specific sequencing and staging requirements to minimize traffic disruption.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-G03), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.