(1): Job JCD0294 Route 94 CALLAWAY, MONTGOMERY County. Resurface and 2 bridge rehabilitations from east of Route 63/54 interchange to east of Bluffton, the total length of improvement being 31.162 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
The contractor shall furnish all labor, materials, equipment, and services for: (1) removal of improvements; (2) excavation and roadbed preparation for Callaway County road approaches; (3) 1-inch surface leveling plant mix bituminous pavement overlay (PG64-22) and 5-inch base course overlay on Callaway County approaches; (4) gravel and aggregate base placement; (5) removal and replacement of damaged pavement; (6) guardrail installation and removal (2,238 LF MGS guardrail, bridge approach transitions, end anchors, and crash-worthy end terminals); (7) bridge end barrier modifications for guardrails at Bridges B03361 and B03381; (8) pavement marking (center lines, edge lines, shoulder rumble strips, thermoplastic markings); (9) signing (warning, regulatory, guide, and construction signs, totaling approximately 2,320 SF); (10) work zone traffic control with channelizers, signs, and flaggers; (11) temporary traffic barriers and delineation devices; (12) emergency services coordination and communication equipment on-site; (13) utility coordination and protection; (14) cooperation between contractors on overlapping projects; (15) contractor-provided quality control testing for plant mix bituminous surface leveling; (16) protection of Katy Trail crossing with flaggers; and (17) seasonal work restrictions (April 1 to October 15 only) for bat hibernacula protection. The contract requires prosecution of work from January 19, 2027 (Notice to Proceed) to November 1, 2027 (Contract Completion Date), or 150 calendar days, whichever is first achieved.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-D07), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.