(1): Job JCD0072 Route 54 CALLAWAY County. Bridge rehabilitation over Route 54 near Holts Summit, the total length of improvement being 0.112 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
Rehabilitate Bridge A3521/A35212 carrying S Summit Drive over US 54, including removal and replacement of concrete wearing surface, diamond grinding, substructure, half-sole and full-depth concrete repairs, strip seal expansion joints, barrier curb replacement and protective coating; reconstruct shoulders with aggregate base and optional shoulder, MGS guardrail and end terminals, signing with footings and I-beam posts, pavement markings, work-zone traffic control with temporary signals and barrier, erosion control, seeding and stormwater compliance.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-D01), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.