(1): Job J2P3095 Route 22 AUDRAIN, BOONE, RANDOLPH County. Resurface and add shoulders from Route 63 to Route E in Audrain County near Centralia, the total length of improvement being 16.072 miles.
Bid opening: 11/20/2026 (submit via Bid Express, https://www.bidx.com/).
The project involves resurfacing 16.072 miles of Route 22 from Route 63 to Route E, including placing 3/4" Type C Ultrathin Bonded Wearing Surface (UBAWS) on the travelway and shoulders, placing bituminous pavement mixture PG64-22 (BP-1) for shoulders, coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) and modified coldmilling (depth transitions), full depth pavement repair with concrete, partial depth pavement repair, shoulder grading, placing Type 1 aggregate for shoulders, installing MGS guardrail, MGS bridge approach transition sections, MGS height and block transitions, Type A crashworthy end terminals (MASH), cross stitch tie bars, pavement markings (preformed thermoplastic and paint), bituminous shoulder rumble strips, changeable message signs, and miscellaneous lump sum temporary traffic control. The work also includes mobilization and removal of improvements.
We post new asphalt opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Missouri Department of Transportation (solicitation 261120-B01), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.