1.00 SCOPE
The Project, including mobilization and demobilization, consists of furnishing and installing water
main and sewage force main improvements as described below.
FORCE MAIN
The Project, including mobilization and demobilization, consists of furnishing and installing
approximately 6,330 linear feet of 8-inch diameter PVC C900 DR18 pipe for a Sewage Force
Main. The pipeline will extend along SW 152nd Street from SW 77th Ave to SW 74th Ave, and
from SW 72nd CT to the west side of the canal at the Paradise Point Drive entrance to Royal
Harbour Yacht Club. The installation includes ductile iron (D.I.) zinc-coated and polyethylene encased
fittings, as well as joint restraints.
Additionally, the project involves the placing of service and grout filling of approximately 1,930
linear feet of 8-inch D.I.P. force main and about 570 linear feet of 6-inch D.I.P. force main. Tasks
involve exploratory excavation for connections to existing 6-inch through 16-inch pipes and a6
existing utility crossings, one connection to an existing reducer with an 8-inch 45-degree bend,
and the installation of one 16” M.J. plug valve. Cut-in plug connections to existing sewage 8-inch
and 6-inch force main will be made for grout injection and abandonment in place.
The scope also includes locating the existing 6-inch force main west of the canal crossing,
connecting it to the existing 6-inch sewage force mains, and installing mechanical joint restraints
as necessary. Additional project components include automatic air release valve assemblies for
the sewage force mains, polyethylene encasement for ductile iron valves, fittings, and restraints,
as well as sheeting, and shoring, and any additional suitable backfill if required.
Coordination with the Miami-Dade Water and Sewer Department (MDWASD) is essential for all
connections, including those to adjacent sewer services. The project will also furnish all materials,
equipment, and supplies necessary for cleaning and testing the force main. The scope also
includes the removal of existing asphalt pavement, sod, and legal disposal of demolition material.
Traffic control, as well as the temporary and permanent replacement of any damaged pavement,
driveways, sod, landscaping, and pavement markings, are also part of the project.
WATER MAIN
The Project, including mobilization and demobilization, involves furnishing and installing
approximately 1,860 linear feet of 8-inch diameter P.V.C. C-900 DR18 pipe for a new water main.
It also includes ductile iron (D.I.) fittings that are zinc-coated and polyethylene wrapped, with joint
restraints, along SW 152nd Street, from SW 67th Avenue to the west side of the canal at Paradise
Point Drive and the entrance to Royal Harbour Yacht Club.
Additionally, the project includes abandoning in place and grouting approximately 1,950 linear
feet of 16-inch D.I.P. water main. The work also involves digging to make connections to the 16-
inch water main and to cross existing utilities, installing one (1) resilient seated gate valve; two
(2) fire hydrant assemblies with 6-inch PVC C900 DR18 fire hydrant lead piping and 6-inch gate
valves; two (2) 1-inch long water services, and connecting to an existing 16-inch butterfly valve
using a 16-inch x 8-inch D.I. reducer.
Other tasks include installing one 8-inch solid sleeve, making plug connections to the existing 16-
inch water main for grout injection and abandonment, and installing air release valve assemblies
for water main. The project also involves sheeting and shoring, which may stay in place if ordered
by the Engineer, and coordinating with MDWASD for all connections, including to nearby water
services.
Additional work includes providing suitable backfill and compaction as needed, furnishing all
materials, equipment and supplies required for cleaning, testing and disinfecting the mains as well
as the removal of existing asphalt pavement, sod and demolition materials. The project also
requires the transport, salvage and legal disposal of demolition materials, placing existing water
mains out of service once the work is completed.
Finally, the project includes the temporary and permanent replacement of any pavement,
sidewalk, sod, pavement markings and/or driveway damage during construction, along with all
other appurtenant and miscellaneous work for a complete and fully functional installation.
The Project is in a portion of Section 22-27, Township 55, Range 40 E, in the Village of Palmetto
Bay, in Miami-Dade County, Florida.
The intent of this Project is to replace Department-owned water and wastewater facilities
that are deficient due to age, capacity, or documented condition, and that affect reliable service
within the project limits. If, during construction, the Department identifies additional facilities that:
(a) are within or adjacent to the project corridor, or (b) are directly connected to the facilities being
replaced and necessary to maintain reliable service, the Department may approve adjustments
to the Project scope to include such facilities. Any such adjustments will be documented by the
Department, must demonstrate a direct relationship to the Project's purpose of maintaining
continuous and reliable service, and be executed in accordance with the contract provisions
governing changes in work.
1.01 MINIMUM REQUIREMENTS OF THE BIDDER
A. License Requirements
MINIMUM EXPERIENCE REQUIRED:
B. Experience
Technical Certification Requirements:
Building Contractor, General Building Contractor, Pipe Lines, Pipelines Engineering Contractor, General Engineering, Underground Utility/Excavation
The project includes furnishing and installing approximately 6,330 linear feet of 8-inch PVC C900 DR18 sewage force main and approximately 1,860 linear feet of 8-inch PVC C900 DR18 water main, along with associated fittings, valves, fire hydrants, and appurtenances. Work also involves abandoning in place and grouting existing mains, exploratory excavation, traffic control, pavement and landscaping restoration, and coordination with the Miami-Dade Water and Sewer Department.
We post new plumbing opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Miami-Dade County Strategic Procurement Department (solicitation P14880), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.