Commodity: MAINT & REPAIR - HEATING, AIR CONDITIONING AND VENTILATION
Type: Commodity / Service
The contractor shall provide all labor, materials, equipment, supervision, permits, inspections, disposal and incidental services for complete replacement of roofing on three elevator towers in Parking Lot 9, including removal of gravel over tar-based system, substrate repair, flashing replacement, installation of Johns Manville 60-mil TPO mechanically fastened system with 1/4-inch Prime DEXcell Board, walk pads, coping and 20-year NDL warranty, and complete replacement at Building C Rand Schrader Clinic including removal of built-up roofing and insulation, metal deck preparation, installation of Johns Manville R-30 5.2-inch rigid insulation with 1/8-inch slope tapered system, new membrane, flashing, 22-gauge coping, sealing of penetrations, cleanup, permits, testing, inspections and warranties including 10-year workmanship warranty.
We post new roofing opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Internal Services Department (solicitation RFB-IS-27200272), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.