Parish: Bossier
Estimated Construction Cost: $250,000 to $500,000
OJT Goal: Trainees
Specbook: 2026
Letting: 11/24/2026 Shreveport — electronic bids via www.bidx.com, downloaded 10:00 a.m.
Schedule of items (31 pay items, quantities for information only):
0001 · 201-01-00100 · Clearing and Grubbing · LUMP · 1
0002 · 202-02-32100 · Removal of Pipe (Cross Drain) 48" CMP 30" RCP · LNFT · 112
0003 · 203-01-00100 · General Excavation · CUYD · 157
0004 · 203-03-00100 · Embankment · CUYD · 9
0005 · 204-02-00100 · Temporary Hay Bales · EACH · 12
0006 · 204-06-00100 · Temporary Silt Fencing · LNFT · 500
0007 · 401-02-00100 · Aggregate Surface Course (Adjusted Vehicular Measurement) · CUYD · 3
0008 · 502-01-00100 · Asphalt Concrete · TON · 80.3
0009 · 502-01-00200 · Asphalt Concrete, Drives, Turnouts and Miscellaneous · TON · 3.1
0010 · 509-01-00100 · Milling Asphalt Pavement · SQYD · 741
0011 · 510-01-00200 · Pavement Patching (12" Minimum Thickness) · SQYD · 171
0012 · 511-01-00100 · Saw Cutting Asphalt Concrete Pavement · INLF · 624
0013 · 701-01-01085 · Cross Drain Pipe (48" RCP/RPVCP/CPEPDW/CPPPDW/CPPPTW) · LNFT · 128
0014 · 701-17-00100 · Trench Excavation Safety Protection (Depth >5 feet) · LNFT · 64
0015 · 711-01-04000 · Riprap (55 lb, 18" Thick) · SQYD · 33
0016 · 711-04-00100 · Geotextile Fabric · SQYD · 33
0017 · 713-01-00100 · Temporary Signs and Barricades · LUMP · 1
0018 · 716-01-00100 · Mulch (Vegetative) · TON · 0.2
0019 · 717-01-00100 · Seeding · LB · 4
0020 · 718-01-00100 · Fertilizer · LB · 124
0021 · 720-01-02020 · Erosion Control System, Flexible (Channel Liner) (Type D) · SQYD · 62
0022 · 724-01-00100 · Rumble Strips (Centerline) · MILE · 0.189
0023 · 724-02-00100 · Rumble Strips (Shoulder/Edge) · MILE · 0.379
0024 · 726-01-00100 · Bedding Material · CUYD · 19.7
0025 · 727-01-00100 · Mobilization · LUMP · 1
0026 · 729-16-00200 · Object Marker Assembly (Type 2) · EACH · 4
0027 · 731-02-00100 · Reflectorized Raised Pavement Markers · EACH · 6…
The project involves the replacement of a cross drain pipe, including clearing and grubbing, removal of existing 48" CMP and 30" RCP pipe, general excavation, embankment, installation of a new 48" cross drain pipe, trench excavation safety protection, riprap, geotextile fabric, temporary signs and barricades, seeding, fertilizing, erosion control, rumble strips, pavement striping, and mailbox installation.
We post new plumbing opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Louisiana work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Louisiana Department of Transportation and Development (solicitation H.017108.6), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.