borrow, milling asphalt concrete, pavement patching, in-place cement treated subgrade, lime treatment, in-place cement stabilized base course, asphalt concrete overlay, and related work.
Route(s): LA 3127
Parish: Ascension; St. James
Estimated Construction Cost: $7,500,000 to $10,000,000
Specbook: 2026
Letting: 11/18/2026 Headquarters — electronic bids via www.bidx.com, downloaded 10:00 a.m.
SPECIAL NOTICE TO CONTRACTORS: Bidders are required to certify their intent to comply with Section 102.14 of the 2026 Louisiana Standard Specifications for Roads and Bridges.
Schedule of items (59 pay items, quantities for information only):
0001 · 202-02-14500 · Removal of Guard Rail · LNFT · 584
0002 · 203-07-00100 · Borrow (Vehicular Measurement) · CUYD · 528
0003 · 203-10-00100 · Cleaning Existing Ditches · LNFT · 1,600
0004 · 204-05-00100 · Temporary Sediment Check Dams (Hay) · EACH · 105
0005 · 204-06-00100 · Temporary Silt Fencing · LNFT · 25,662
0006 · 303-01-00400 · In-Place Cement Stabilized Base Course (12" Thick) · SQYD · 68,432
0007 · 303-02-00100 · Removal of Existing Patches · SQYD · 929
0008 · 304-01-00100 · Lime · TON · 970.02
0009 · 304-03-00400 · Lime Treatment (Type C) (12" Thick) · SQYD · 68,432
0010 · 309-01-12000 · In-Place Cement Treated Subgrade (12" Thick) · SQYD · 34,216
0011 · 401-02-00100 · Aggregate Surface Course (Adjusted Vehicular Measurement) · CUYD · 135
0012 · 502-01-00100 · Asphalt Concrete · TON · 41,186.5
0013 · 502-01-00200 · Asphalt Concrete, Drives, Turnouts and Miscellaneous · TON · 414
0014 · 509-01-00100 · Milling Asphalt Pavement · SQYD · 240,770
0015 · 509-02-00100 · Contractor Retained Reclaimed Asphalt Pavement · CUYD · -15,735
0016 · 510-01-00300 · Pavement Patching (18" Minimum Thickness) · SQYD · 122
0017 · 511-01-00100 · Saw Cutting Asphalt Concrete Pavement · INLF · 1,320
0018 · 704-03-00200 · Blocked Out Guard Rail - 31", (6'-3" Post Spacing) · LNFT · 112.5
0019 · 704-06-00200 · Guard Rail Bridge Attachments (Single Thrie Beam) · LNFT · 50
0020 · 704-07-00200 · Guard Rail Transitions (Double Thrie Beam) · LNFT · 100
0021 · 704-10-00310 · Guard Rail End Treatment, NCHRP 350 - 31" (TL-3 Flared) · EACH · 4
0022 · 713-01-00100 · Temporary Signs and Barricades · LUMP · 1
0023 · 713-02-00300 · Temporary Pavement Markings (8" Width) · LNFT · 7,730
0024 · 713-02-00500 · Temporary Pavement…
The work consists of borrow (vehicular measurement), milling asphalt concrete, pavement patching, in-place cement treated subgrade, lime treatment, in-place cement stabilized base course, asphalt concrete overlay, removal of guard rail, cleaning existing ditches, temporary sediment check dams, temporary silt fencing, aggregate surface course, saw cutting asphalt concrete pavement, guard rail installation, temporary signs and barricades, temporary and permanent pavement markings, rumble strips, mobilization, object marker assemblies, reflectorized raised pavement markers, plastic pavement striping, hydro-seeding, and construction layout.
We post new asphalt opportunities in Louisiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Louisiana work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Louisiana Department of Transportation and Development (solicitation H.016223.6), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.