1ST STREET WIDENING, AMMON (ITD Major highways project, Key No. 24250).
Location: Bonneville County, Idaho (ITD District LHTAC). Funding: Federal.
Bid opening: November 10, 2026.
The work includes survey monument preservation, selective tree removal, removal of signs, concrete headwalls, sidewalks, curbs, gutters, fences, and pavement markings. It also includes excavation, water for dust abatement, fiber wattle, inlet protection, water and pollution control, topsoil placement, granular subbase and aggregate base installation, asphalt tack coat, approach construction, Superpave HMA pavement, irrigation pipe, storm sewer pipe, manholes, catch basins, valve cover adjustments, minor structures (sediment control catch basin, irrigation diversion box, concrete headwall), sidewalk, driveway, curb ramp, curb and gutter, traffic separator, signs and sign posts, illumination, topsoil, mulch, tree and shrub planting, soil conditioner, seed bed preparation, seeding, fertilizing, water delivery system, mulch plus tackifier, temporary traffic control items, pavement markings, mailbox installation, signal housing, intersection preemption detection system, video detection system, electrical service pedestal, intersection signal structure, pedestrian system, signal cabinet, controller, pedestrian and traffic control signal head frangible poles, combined cabinet and service pedestal foundation, additional electrical items, survey, directed surveying, record drawings, contingency amount for miscellaneous work, removal and resetting of boulders, removal of infiltration structure, removal and resetting of mailbox, rotation of manhole lids, surface mounted delineators, removal and resetting of luminaires, temporary traffic control, relocation of sprinkler boxes, 8-inch cast-in-place liner, removal and replacement of chain link fence, underground infiltration, weed barrier fabric, and mobilization.
We post new asphalt opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Idaho Transportation Department (solicitation 24250), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.