SH-3, ST MARIES RIVER BR (ITD Major highways project, Key No. 23257).
Location: Shoshone County, Idaho (ITD District 1). Funding: Federal.
Bid opening: December 08, 2026.
The work includes full removal of the existing bridge and construction of a steel bridge (222,770 lbs) with concrete Class 40-A and 40 AF, metal and epoxy-coated and GFRP reinforcement, steel H-piles including test piles with shoes and tips and predrilling, elastomeric bearings, compression expansion joint, PPC overlay, and approach slabs. Roadway work includes excavation, granular borrow and subbase, aggregate base, tack coat and Superpave HMA pavement, W-beam guardrail with terminals, transitions and crash cushions, signs, posts, delineators, snow poles, pavement markings, and utility conduit. Site and environmental work includes clearing and grubbing, selective tree removal, topsoil, seeding, fertilizing, erosion control, loose riprap, streambed material, high-strength geotextile, dewatering, temporary shoring, temporary diversion and turbidity monitoring, survey monuments, survey and directed surveying, temporary traffic control including a temporary signal, and mobilization with record drawings and contingency for directed landscaping.
We post new structural work opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Idaho Transportation Department (solicitation 23257), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.