SH 3, MIDDLE FK POTLATCH CR BR TO BOTTOM OF BEAR RIDGEE (ITD Major highways project, Key No. 22208).
Location: Latah County, Idaho (ITD District 2). Funding: Federal.
Bid opening: December 15, 2026.
The project includes partnering, survey monument preservation, removal of signs, metal guardrail, and miscellaneous items (sidewalk and driveway); shoulder aggregate and grading; guardrail terminal grading; inlet protection; water and pollution control; aggregate base; CSS-1 emulsion for tack coat; approaches; Superpave HMA pavement; cold milling; adjustment of manhole and valve covers; W-beam guardrail and terminals; sidewalk; driveway; signs (types B-1, C-1, E) and steel sign posts; sign brackets and braces; delineators; mileposts; street monuments; miscellaneous temporary traffic control items; waterborne and preformed thermoplastic pavement markings; long pavement markings (waterborne and preformed thermoplastic); rumble strips; mailbox; record and reestablish pavement markings; contingency amounts for erosion/pollution control and miscellaneous work; curb ramps; temporary traffic control design and operations; drywell type A; aggregate production quality testing; soft spot repair; sidewalk grinding; traffic control supervisor; and mobilization.
We post new asphalt opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Idaho Transportation Department (solicitation 22208), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.