INTERSECTION IMPROVEMENT, ROUNDABOUT
Contract: R-43388-A (Call 150)
District: LaPorte District
Project control nos.: 1702994
Completion date: June 02, 2028
Goals: DBE Goal: 0.00
Prequalification: B(A) C(B) E(E)
Bids open December 9, 2026 at 10:00 AM local via Bid Express (https://bidx.com/in/lettings).
Contractors must register in advance by emailing their request to bid to INDOTbidders@indot.in.gov no later than 9:00 AM on the bid opening date.
Section No.: 1 INTERSECTION IMPROVEMENT, ROUNDABOUT
.
Line
Item No Item Code Description Quantity Unit
0001 105-06845 CONSTRUCTION ENGINEERING 1.00 LS
0002 109-08359 LIQUIDATED DAMAGES 1.00 DOL
0003 109-08360 CONTRACT LIENS 1.00 DOL
0004 109-08440 QUALITY ADJUSTMENTS, HMA 1.00 DOL
0005 109-08441 QUALITY ADJUSTMENTS, PCCP 1.00 DOL
0006 109-08443 QUALITY ADJUSTMENTS, TEMPORARY TRAFFIC CONTROL DEVICES AND MARKINGS 1.00 DOL
0007 109-08444 QUALITY ADJUSTMENTS, FAILED MATERIALS 1.00 DOL
0008 109-09489 PAYMENT ADJUSTMENT, PG ASPHALT BINDER 1.00 DOL
0009 109-11362 QUALITY ADJUSTMENTS, FAILURE TO MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES 1.00 DOL
0010 110-01001 MOBILIZATION AND DEMOBILIZATION 1.00 LS
0011 201-52370 CLEARING RIGHT-OF-WAY 1.00 LS
0012 202-02240 PAVEMENT REMOVAL 8242.00 SYS
0013 202-02928 CATCH BASIN, REMOVE 1.00EACH
0014 202-93047 MANHOLE, REMOVE 1.00EACH
0015 202-96133 PIPE, REMOVE 367.00 LFT
0016 203-02000 EXCAVATION, COMMON 4680.00 CYS
0017 205-11626 PUMP AROUND 2.00EACH
0018 205-12108 STORMWATER MANAGEMENT BUDGET 37292.00 DOL
0019 205-12616 STORMWATER MANAGEMENT IMPLEMENTATION 1.00 LS
0020 205-12618 SWQCP PREPARATION 1.00 LS
0021 207-08264 SUBGRADE TREATMENT, TYPE II 764.00 SYS
0022 207-09935 SUBGRADE TREATMENT, TYPE IC 13685.00 SYS
0023 211-09264 STRUCTURE BACKFILL, TYPE 1 506.00 CYS
0024 214-12239 GEOTEXTILE FOR PAVEMENT, TYPE 2B 5444.00 SYS
0025 301-12233 COMPACTED AGGREGATE, NO. 8 1327.00 CYS
0026 301-12234 COMPACTED AGGREGATE, NO. 53 81.00 CYS
0027 303-01180 COMPACTED AGGREGATE, NO. 53 417.00 TON
0028 303-07449 COMPACTED AGGREGATE, NO.
The work includes construction engineering, mobilization and demobilization, clearing right-of-way, pavement removal, removal of catch basins, manholes, and pipe, common excavation, pump around, stormwater management budget and implementation, SWQCP preparation, subgrade treatment, structure backfill, geotextile for pavement, compacted aggregate, milling, QC/QA HMA, joint adhesive, void reducing asphalt membrane, asphalt for tack coat, PCCP, concrete sidewalk, curb ramp, detectable warning surfaces, integral concrete curb, concrete curb and gutter, PCCP for approaches, monument installation, right-of-way markers, riprap, geotextile for riprap, mulched seeding, sodding, topsoil processing and distribution, pipe installation of various types and diameters, video inspection for pipe, pipe end sections, catch basins, manholes, inlets, road closure sign assemblies, detour route marker assemblies, construction signs, maintaining traffic, barricades, sign posts, traffic signal equipment removal, rectangular rapid flashing beacons, conduit, handholes, lighting foundations, light poles, service points, and thermoplastic pavement markings including crosswalk lines, yield lines, lane indication arrows, and solid lines.
We post new asphalt opportunities in Indiana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Indiana Department of Transportation (solicitation R43388A-20261209), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.