6.7 miles of resurfacing on IL 127 from US 50 South Junction in Carlyle to the Washington County line.
Item: 122
Contract: 76V33
Region/District: 5 / 8
DBE goal: Pending%
VBP goal: Pending%
Federal Project: STP1I2K(016)
Key Routes: FAP 42A
Marked Routes: IL 127
Sections: (130,1)RS-6
State Jobs: C-98-159-26
Contract specifics:
The project resurfaces 6.7 miles of IL 127 with hot-mix asphalt binder course IL-9.5FG N70 and surface course IL-9.5 Mix D N70, including 2 3/4-inch surface removal, tack coat, longitudinal joint sealant, Class B patches, welded wire reinforcement, dowel and tie bars, aggregate wedge and hot-mix asphalt shoulders, shoulder and sinusoidal rumble strips, combination curb and gutter, sidewalk and detectable warnings, traffic control and protection, short-term and thermoplastic pavement markings, raised reflective pavement markers, mobilization, Engineer's field office, railroad protective liability insurance, survey monuments and trainees.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 76V33), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.