Resurfacing on IL 100 from 0.3 miles south of US 67 to south of Naples Road, north of Bluffs. Also includes scarification and micro-surfacing of SN 069-0062 on IL 100 at Spring Run Creek, 0.4 miles north of the Scott County line.
Item: 097
Contract: 72C61
Region/District: 4 / 6
DBE goal: Pending%
VBP goal: Pending%
Federal Project: STP-BRXXD8(862)
Key Routes: FAP 562
Marked Routes: IL 100
Sections: 116RS-6,(116B-1)BDR-1
State Jobs: C-96-067-26
Contract specifics:
The contractor will resurface IL 100 from 0.3 miles south of US 67 to south of Naples Road north of Bluffs and perform scarification and micro-surfacing of SN 069-0062 at Spring Run Creek. The pay items cover hot-mix asphalt binder and surface courses, incidental surfacing, surface removal, aggregate shoulders and hot-mix asphalt shoulders, earth excavation, steel plate beam guardrail with terminals and removal, sinusoidal rumble strips, concrete curb repair, bridge deck scarification, microsilica concrete overlay, deck grooving, protective coat and deck slab repair, drainage inlet adjustment, pavement markings, raised reflective markers, traffic control and protection, temporary signals and rumble strips, changeable message signs, mobilization and Engineer's Field Office.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 72C61), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.