Culvert replacement and intersection reconstruction on US 6 0.1 miles west of 1050E and at the intersection of US 6 and 1050E.
Item: 044
Contract: 64M06
Region/District: 2 / 2
DBE goal: Pending%
VBP goal: Pending%
Federal Project: STP8D8I(613)
Key Routes: FAS 226
Marked Routes: US 6
Sections: 4CR
State Jobs: C-92-150-24
The work includes earth excavation, removal and disposal of unsuitable material, porous granular embankment, trench backfill, porous granular backfill, topsoil furnish and place, exploration trench, seeding, erosion control blanket, turf reinforcement mat, temporary ditch checks, inlet and pipe protection, stone riprap, filter fabric, aggregate subgrade improvement, bituminous materials, hot-mix asphalt surface course, hot-mix asphalt pavement (full-depth), pavement removal, hot-mix asphalt surface removal, class D patches, aggregate shoulders, removal of existing structures, pipe culvert removal, structure excavation, name plates, box culvert end sections, precast concrete box culverts, traversable pipe grate, sloped metal end section with grate, concrete end section, pipe culverts, membrane waterproofing, geocomposite wall drain, pipe drains, field tile junction vaults, delineators, right of way markers, engineer's field office, mobilization, traffic control and protection, changeable message sign, short term pavement marking, short term pavement marking removal, sign panels, remove sign panels, telescoping steel sign support, wood sign support, paint pavement marking, drop box, traffic control and protection (special), remove and reinstall sign panel, construction layout, and rock fill.
We post new asphalt opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 64M06), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.