Sidewalk replacement along various routes in the city of Oak Forest. Additional work includes curb and gutter, ADA ramps, driveway replacement and other required work.
Item: 023
Contract: 61F87
Region/District: 1 / 1
DBE goal: Pending%
VBP goal: Pending%
Federal Project: T1ME(771)
Key Routes: VARIOUS
Sections: 14-00102-00-SW (OAK FOREST)
State Jobs: C-91-309-16
Contract specifics:
Work includes tree trunk protection, root pruning, and tree pruning (8 to 39 trees); excavation of 2,420 cubic yards of earth and removal of 1,465 cubic yards of unsuitable material; furnish and place of 5,500 square yards of topsoil and sodding with supplemental watering; application of fertilizer nutrients; placement of aggregate base course (9,963 and 2,750 square yards of 4-inch and 8-inch depths); prime and tack coat application; 475 tons of hot-mix asphalt surfacing; concrete driveway pavement (928 square yards, 6 inch); concrete sidewalk pavement (68,885 square feet, 5 inch and 12,432 square feet, 6 inch); detectable warning installation (861 square feet); driveway pavement removal (5,253 square yards) and sidewalk removal (4,097 square feet); adjustment of fire hydrants, water service boxes, catch basins, manholes, and valve boxes; concrete curb type B replacement (1,760 feet of combination curb and gutter); mobilization; traffic control and protection; sign panel installation, removal and relocation; thermoplastic and paint pavement markings; remove and re-erect boulders; remove and reinstall brick paver (42 square feet); mailbox removal and replacement (8 units); stump removal; temporary access (126 private entrances and 8 commercial entrances); asphalt patches (90 and 326 square yards); engineer's field office (6 calendar months); temporary information signing (216 square feet); concrete steps removal (7 units) and installation (5 cubic yards); construction layout; drainage and utility structure adjustments (57 units); and trainees and trainee program graduate labor (500 hours each).
We post new concrete opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Illinois Department of Transportation (solicitation 61F87), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.