- County
- WASHINGTON
- Bid Order
- 114
- Enriched
- Yes
- Projects
- STP-S-TSF-C092(134)--5P-92, STP-S-TSF-C092(128)--5P-92
- Proposal Id
- 92-C092-134
- Letting Date
- Dec 15, 2026
- List Url Hint
- ia.iowadot.gov/contracts/biddocuments
- Package Text
- 11/10/2026 11:19 AM
CONTRACTS AND SPECIFICATIONS BUREAU
Proposal
Proposal ID: 92-C092-134 Letting Date: December 15, 2026
Call Order: 114
Proposal Work Type: PCC OVERLAY
DBE Goal: 0.0%
Contracting Authority: WASHINGTON COUNTY
Proposal Guaranty: $500,000.00
This proposal includes the following project(s):
Project Number: STP-S-TSF-C092(128)--5P-92 County: WASHINGTON
Project Work Type: PCC OVERLAY Route: GINKGO AVE.
Location: On Ginkgo Ave, from 170th Street N to Wellman
Road System: FARM TO MARKET ROAD
Federal Aid - Wages: Federal Aid - Predetermined Wages are in Effect
Project Number: STP-S-TSF-C092(134)--5P-92 County: WASHINGTON
Project Work Type: PCC OVERLAY Route: GINKGO AVE.
Location: On Ginkgo Avenue, from IA 92 N to past 170th Street intersection
Road System: FARM TO MARKET ROAD
Federal Aid - Wages: Federal Aid - Predetermined Wages are in Effect
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Contract Time
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
Site ID Site Details Liquidated
Damages
00 Late Start Date 06/14/2027 70 WORK DAYS $2,000.00
.
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
Notes
Notes :
There are no notes for this proposal.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
Note Description
001.2023 *** STANDARD SPECIFICATIONS -- SERIES 2023 ***
The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2023, plus applicable General
Supplemental Specifications, Developmental Specifications, Supplemental
Specifications AND Special Provisions shall apply to construction work on this contract.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
Note Description
005.1107.02 *** Revisions to Article 1107.02 ***
Article 1107.02, Insurance, is amended by the following modifications and additions.
This proposal note becomes null and void January 1, 2027.
A. It shall be the Contractor's responsibility to have liability insurance covering all
of the construction operations incident to contract completion and the Contractor must
have on file with the Contracting Authority a current "Certificate of Insurance" prior to
award of contract. The certificate shall identify the insurance company firm name and
address, Contractor firm name, policy period, type of policy, limits of coverage, and
scope of work covered (single contract or statewide). This requirement shall apply with
equal force, whether the work is performed by persons employed directly by the
Contractor including a subcontractor, persons employed by a subcontractor, or by an
independent contractor.
B. In addition to the above, the Contracting Authority shall be included as an
insured party, or a separate owner's protective policy shall be filed showing the
Contracting Authority as an insured party.
C. The liability insurance shall be written by an insurance company (or
companies) qualified to do business in Iowa. For independent contractors engaged
solely in the transportation of materials, the minimum coverage provided by such
insurance shall be not less than that required by Chapter 325A, Code of Iowa, for such
truck operators or contract carriers as defined therein. For all other contractors,
subcontractors, independent contractors, and the Contracting Authority, the minimum
coverage by such insurance shall be as follows:
General Liability, Including: BODILY INJURY
Independent Contractors $500,000 Each Occurrence
Contractual Liability, $500,000 Aggregate
Products and Completed PROPERTY DAMAGE
Operations $250,000 Each Occurrence
$250,000 Aggregate
or
BODILY INJURY AND PROPERTY DAMAGE
- COMBINED SINGLE LIMIT*
$750,000 Each Occurrence
$750,000 Aggregate
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
Note Description
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
D. Failure on the part of the Contractor to comply with the requirements of this
article will be considered sufficient cause to suspend the work, withhold estimates, and
to deny the Contractor from receiving further contract awards, as provided in Article
1103.01.
500.01 *** WINTER WORK ***
The free time allowed between November 15 and April 1 will not be permitted on this
project. The Contractor shall work during the winter on all working days as defined in
Article 1101.03 'Working Day'.
DS-23052 DEVELOPMENTAL SPECIFICATIONS FOR PAVEMENT INTERLAYER GEOTEXTILE
FOR PCC OVERLAYS
DS-23088 DEVELOPMENTAL SPECIFICATIONS FOR DIAMOND GRINDING RUMBLE STRIPS
FHWA-1273.09 FHWA-1273: REQUIRED CONTRACT PROVISIONS FEDERAL-AID
CONSTRUCTION CONTRACTS -- REVISED OCTOBER 23, 2023
23 U.S.C. 133(i) requires application of Davis Bacon predetermined wages on certain
projects on roads functionally classified as a local road or a rural minor collector. This
supersedes the applicability described in FHWA-1273 Section IV.
GS-23007 GENERAL SUPPLEMENTAL SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION, OCTOBER 20, 2026 RELEASE
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Specifications List
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
Note Description
IA26-28.4A PREDETERMINED WAGE RATE - GENERAL DECISION NUMBER IA20260028
FOR HEAVY AND HIGHWAY CONSTRUCTION -- STATEWIDE (EXCEPT SCOTT
COUNTY)
Note: The Contractor shall review the contract documents and
is responsible for identifying which zone(s), as defined
in the Predetermined Wage Rate specification, apply to
the work on the contract.
*** Additional Requirement ***
Contracts where the Department is the Contracting Authority:
The Prime Contractor and each approved Subcontractor shall submit certified payrolls
weekly to the Project Engineer. Each Contractor shall use the AASHTOWare Project
Civil Rights and Labor (AWP CRL) software to electronically submit Certified Payroll
Reports. The Contractor shall list the craft for each employee covered by the
Predetermined Wage Rates. The Prime Contractor shall review and approve each
Subcontractor’s payroll within AWP CRL.
Contracts where the Department is not the Contracting Authority:
The Prime Contractor shall submit certified payrolls for itself and each approved
Subcontractor weekly to the Project Engineer. The Contractor may use the Iowa D.O.T.
Certified Payroll form or other approved form. The Contractor shall list the craft for
each employee covered by the Predetermined Wage Rates. The Prime Contractor
shall sign each of the Subcontractor's payrolls to acknowledge the submittal of the
Certified Payroll.
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
SECTION: 0001
ROADWAY ITEMS - STP-S-TSF-C092(128)--5P-92
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0010 2102-0425070 126.000
SPECIAL BACKFILL TON _________._____ _________._____
0020 2121-7425020 5,429.000
GRANULAR SHOULDERS, TYPE B TON _________._____ _________._____
0030 2213-7100400 20.000
RELOCATION OF MAIL BOXES EACH _________._____ _________._____
0040 2310-5151040 17,106.000
PORTLAND CEMENT CONCRETE
OVERLAY, FURNISH ONLY
CY _________._____ _________._____
0050 2310-5151045 69,993.000
PORTLAND CEMENT CONCRETE
OVERLAY, PLACEMENT ONLY
SY _________._____ _________._____
0060 2310-8300550 70,730.000
PAVEMENT INTERLAYER
GEOTEXTILE
SY _________._____ _________._____
0070 2317-7000110 29,600.000
PAYMENT ADJUSTMENT
INCENTIVE/DISINCENTIVE FOR PCC
PAVEMENT SMOOTHNESS (BY
SCHEDULE)
EACH 1.00000 29,600.00
0080 2510-6745850 493.000
REMOVAL OF PAVEMENT SY _________._____ _________._____
0090 2526-8285040
CONSTRUCTION SURVEY, LOCATION
SURVEY
LUMP SUM LUMP SUM _________._____
0100 2527-9263209 496.060
PAINTED PAVEMENT MARKINGS,
WATERBORNE OR SOLVENT-BASED
STA _________._____ _________._____
0110 2527-9270112 393.500
GROOVES CUT FOR PAVEMENT
MARKINGS
STA _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
SECTION: 0001
ROADWAY ITEMS - STP-S-TSF-C092(128)--5P-92
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0120 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
0130 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
0140 2548-0000260 317.730
DIAMOND GROUND SHOULDER
SINUSOIDAL RUMBLE STRIPS, PCC
SURFACE
STA _________._____ _________._____
0150 2548-0000365 193.250
DIAMOND GROUND CENTERLINE
SINUSOIDAL RUMBLE STRIPS, PCC
SURFACE
STA _________._____ _________._____
Section: 0001 Total: _________._____
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
SECTION: 0002
ROADWAY ITEMS - STP-S-TSF-C092(134)--5P-92
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0160 2102-0425070 378.000
SPECIAL BACKFILL TON _________._____ _________._____
0170 2121-7425020 7,207.000
GRANULAR SHOULDERS, TYPE B TON _________._____ _________._____
0180 2213-7100400 11.000
RELOCATION OF MAIL BOXES EACH _________._____ _________._____
0190 2214-5145150 556.000
PAVEMENT SCARIFICATION,
NOMINAL THICKNESS
SY _________._____ _________._____
0200 2303-1033500 262.000
HOT MIX ASPHALT STANDARD
TRAFFIC, SURFACE COURSE, 1/2 IN.
MIX, NO SPECIAL FRICTION
REQUIREMENT
TON _________._____ _________._____
0210 2303-1258283 15.700
ASPHALT BINDER, PG 58-28S,
STANDARD TRAFFIC
TON _________._____ _________._____
0220 2310-5151040 22,960.000
PORTLAND CEMENT CONCRETE
OVERLAY, FURNISH ONLY
CY _________._____ _________._____
0230 2310-5151045 93,961.000
PORTLAND CEMENT CONCRETE
OVERLAY, PLACEMENT ONLY
SY _________._____ _________._____
0240 2310-8300550 94,220.000
PAVEMENT INTERLAYER
GEOTEXTILE
SY _________._____ _________._____
0250 2317-7000110 40,000.000
PAYMENT ADJUSTMENT
INCENTIVE/DISINCENTIVE FOR PCC
PAVEMENT SMOOTHNESS (BY
SCHEDULE)
EACH 1.00000 40,000.00
Contracts and Specifications Bureau
11/10/2026 11:19 AM
Proposal Schedule of Items
Proposal ID: 92-C092-134 Call Order: 114 Letting Date: December 15, 2026
SECTION: 0002
ROADWAY ITEMS - STP-S-TSF-C092(134)--5P-92
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0260 2510-6745850 1,206.000
REMOVAL OF PAVEMENT SY _________._____ _________._____
0270 2526-8285040
CONSTRUCTION SURVEY, LOCATION
SURVEY
LUMP SUM LUMP SUM _________._____
0280 2527-9263209 656.240
PAINTED PAVEMENT MARKINGS,
WATERBORNE OR SOLVENT-BASED
STA _________._____ _________._____
0290 2527-9270112 532.960
GROOVES CUT FOR PAVEMENT
MARKINGS
STA _________._____ _________._____
0300 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
0310 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
0320 2548-0000260 467.400
DIAMOND GROUND SHOULDER
SINUSOIDAL RUMBLE STRIPS, PCC
SURFACE
STA _________._____ _________._____
0330 2548-0000365 250.550
DIAMOND GROUND CENTERLINE
SINUSOIDAL RUMBLE STRIPS, PCC
SURFACE
STA _________._____ _________._____
Section: 0002 Total: _________._____
Total Bid: _________._____
DS-23052
(Replaces DS-23017)
DEVELOPMENTAL SPECIFICATIONS
FOR
PAVEMENT INTERLAYER GEOTEXTILE FOR PCC OVERLAYS
Effective Date
February 20, 2024
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
SHALL PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23052.01 DESCRIPTION.
Place pavement interlayer geotextile as shown on the plans.
23052.02 MATERIALS.
A. Pavement Interlayer Geotextile.
Provide a pavement interlayer meeting AASHTO M 288, except as modified below:
Table DS-23052.02-1: Pavement Interlayer Geotextile Properties
Property Requirement Test Method
Fabric Type Non-woven Geotextile, no thermal
treatment
EN 13249, Annex F
Mass per unit area ≥13.3 oz/sq.yd and ≤16.2 oz/sq.yd ASTM D 5261
Thickness under
load (pressure)
0.29 psi: ≥ 0.12 inches
2.9 psi: ≥ 0.10 inches
29 psi: ≥ 0.04 inches
ASTM D 5199,
modified under loads
of 0.29, 2.9, and 29
psi
Tensile strength ≥ 685 lb/ft ASTM D 4595
Maximum elongation ≤ 130% ASTM D 4595
Water permeability in
normal direction
under load
(pressure)
≥ 3.3×10-4 ft/s[under pressure of
2.9 psi]
ASTM D 5493
Water permeability in
the plane direction
of the fabric
(transmittivity) under
load (pressure)
≥ 1.6×10-3 ft/s [under pressure of
2.9 psi]
≥ 6.6×10-4 ft/s [under pressure of
29 psi]
ASTM D 6574
Weather resistance Resistance ≥ 60% EN 12224
Alkali resistance ≥ 96% Polypropylene/Polyethylene EN 13249, Annex B
Note: EN is European Standard
DS-23052, Page 2 of 2
B. For each lot of material, furnish manufacturer’s certification statement to Engineer stating name of
manufacturer, chemical composition of filaments or yarns, and compliance with this specification.
Include test results from specific lots for all specification requirements.
23052.03 CONSTRUCTION.
A. Sweep pavement to remove loose debris before applying pavement interlayer geotextile.
B. Ensure geotextile is tight without excess wrinkles and folds.
C. Do not place more than 650 feet of geotextile in front of paver if construction traffic is expected on
the grade in front of the paver. Place geotextile and secure per Article DS-23017.03, D. If
geotextile fails to remain secured in place resecure loose geotextile and limit placement length in
advance of the paving machine such that proper securement can be maintained. Limit driving on
geotextile to a minimum. Delay installation on areas subject to excess traffic, such as crossovers,
until immediately before concrete placement.
D. Use one of the following methods to secure the geotextile:
1. Secure geotextile with pins or nails punched through 2 to 2.75 inch galvanized washers or
disks every 6 feet or less. Place additional fasteners as needed to ensure geotextile does not
shift or fold during concrete placement.
2. Secure geotextile with 3M HoldFast 70 Cylinder Spray Adhesive or approved alternate. Apply
to all edges of the fabric and as needed to prevent shifting or folding of the fabric during
concrete placement.
3. Other anchoring methods approved by the Engineer.
E. Do not allow more than three layers of the geotextile to overlap in any location. Overlap edges of
geotextile by 8 inches ± 2 inches. Sequence rolling out geotextile to ensure good lapping practice
and prevent folding or tearing by construction traffic.
F. Extend free edge of geotextile interlayer a minimum of 4 inches beyond edge of pavement.
Terminate interlayer in a drainable layer. Do not impair free drainage within the geotextile.
G. Keep geotextile clean and free of loose debris before concrete placement.
23052.04 METHOD OF MEASUREMENT.
The quantity of Pavement Interlayer Geotextile will be the quantity in square yards shown in the contract
documents.
23052.05 BASIS OF PAYMENT.
Payment for Pavement Interlayer Geotextile will be at the contract unit price per square yard. Payment is
full compensation for furnishing materials, labor and equipment necessary to install the pavement
interlayer geotextile.
DS-23088
(Replaces DS-23085)
DEVELOPMENTAL SPECIFICATIONS
FOR
DIAMOND GRINDING RUMBLE STRIPS
Effective Date
October 20, 2026
THE STANDARD SPECIFICATIONS, SERIES 2023, ARE AMENDED BY THE FOLLOWING
MODIFICATIONS AND ADDITIONS. THESE ARE DEVELOPMENTAL SPECIFICATIONS AND THEY
PREVAIL OVER THOSE PUBLISHED IN THE STANDARD SPECIFICATIONS.
23088.01 DESCRIPTION.
Provide equipment, furnish all necessary labor and materials, and perform all operations necessary for
diamond grinding standard or sinusoidal rumble strips in HMA or PCC surfaces. Diamond grind rumble
strips to the dimensions and spacing shown in the contract documents. Apply diluted asphalt emulsion to
the diamond ground shoulder rumble strips on HMA surfaces by means of a bituminous distributor.
23088.02 MATERIALS.
A. Use asphalt emulsion Grade CSS-1, CSS-1h, SS-1, or SS-1h meeting requirements of Section
4140 of the Standard Specifications.
B. Dilute the asphalt emulsion with water prior to application to the milled shoulder rumble strip. The
dilution rate is one part of asphalt emulsion to one part of water.
23088.03 CONSTRUCTION.
A. General.
1. Notify the Engineer if degraded areas are encountered that will not accommodate diamond
ground rumble strips. Skip those sections.
2. Allow PCC to cure for a minimum of 14 days prior to placing diamond ground rumble strips.
When maturity is used for opening, placement of diamond ground rumble strips may begin
when 350psi flexural strength is achieved.
B. Equipment.
1. Perform grinding using stacked diamond blades mounted on a self propelled machine that
has been designed for grinding PCC or HMA surfaces. Polycrystalline diamond (PCD) heads
are not considered an approved equal for stacked diamond blades. Ensure the equipment will
not cause strain or damage to the underlying pavement.
2. Do not use grinding equipment that causes excessive ravels, aggregate fractures, spalls, or
excessive disturbance of the transverse and/or longitudinal joints. The finished surface after
grinding the rumble strips should have a corduroy like texture.
3. For standard rumble strips use grinding equipment with a minimum effective head width
suitable for grinding the entire width of the rumble strip in one pass. For centerline rumble
strips use a grinding head equipped to grind the rumble strip on each side of the centerline in
one pass.
4. Select the blade type and number of blades per foot to provide proper surface texture based
on the material being ground, in particular, the coarse aggregate type.
C. Test Strip.
Demonstrate to the Engineer on an initial 500 foot test section that the equipment and method will
provide the desired diamond ground rumble strip and surface inside each depression without
damaging the adjacent pavement. If the desired results are not being provided, as determined by
the Engineer, provide different equipment or methods, or make necessary adjustments to provide
the desired results. If the initial 500 foot section results are unsatisfactory, repair or replace the
section as determined by the Engineer, at no additional cost to the Contracting Authority.
D. Grinding.
1. Grind shoulder rumble strips in a straight line, offset from the painted edge line as shown in
the contract documents. Do not deviate from that offset more than ±2 inches. Ensure the
depth of the rumble strips is as shown in the contract documents. The Engineer will randomly
check the alignment and depth.
2. Grind centerline rumble strips in a straight line, on the centerline joint as shown in the
contract documents. Do not deviate from that location more than ±1 inch. Ensure the depth of
the rumble strips is as shown in the contract documents. The Engineer will randomly check
the alignment and depth.
3. Continuously remove all slurry or residue resulting from the grinding operations. Do not
deposit on the slab or shoulder. Leave pavement and paved shoulders in a clean condition.
Ensure residue from grinding operations does not flow across lanes occupied by public traffic.
This residue may be spread on the foreslope or removed according to Article 1104.08 of the
Standard Specifications. When residue is deposited on the foreslope in areas where cable
guardrail is present, spread the residue in a manner that prevents it from collecting in the
sockets for the cable guardrail system. Take measures to prevent damage to vegetation
during spreading of residue. If damage occurs, repair at no cost to the Contracting
Authority. Do not allow discharge of slurry or residue into gutters, drainage facilities, or
bodies of water.
E. Asphalt Emulsion Fog Seal.
Per Article 2548.03, C of the Standard Specifications.
F. Limitations.
Do not disturb desirable grass areas and desirable trees outside the construction limits. Do not
park or service vehicles and equipment or use these areas for storage of materials. Obtain the
Engineer’s approval for storage, parking, and service areas.
23088.04 METHOD OF MEASUREMENT.
Measurement will be as follows:
A. Diamond Ground Shoulder Rumble Strips.
Stations shown in the contract documents for each type, measured along each edge of mainline
pavement. Unless stated otherwise in the contract documents, no deduction will be made for
gapped areas. The quantity will be adjusted for the length of degraded shoulders skipped, asDS-23088, Page 3 of 10
defined in Article DS-23088.03 of this specification. The quantity will be adjusted for test sections
that were deemed unsatisfactory.
B. Diamond Ground Centerline Rumble Strips.
Stations shown in the contract documents for each type, measured along the centerline of
mainline pavement. Unless stated otherwise in the contract documents, no deduction will be
made for gapped areas. The quantity will be adjusted for the length of degraded pavement
skipped, as defined in Article DS-23088.03 of this specification. The quantity will be adjusted for
test sections that were deemed unsatisfactory.
C. Asphalt Emulsion for Fog Seal (Shoulder Rumble Strips).
Gallons computed from field measurements of distributors or from tank cars or transport trucks as
provided in Article 4100.03 of the Standard Specifications. When quantities computed from field
measurements check within 1.0% of the billed gallons, payment will be based on billed gallons.
When quantities computed from field measurements differ from billed gallons by more than 1.0%,
payment will be based on the quantity from field measurements. From these quantities, any
amount used by the Contractor as fuel, left in cars, or otherwise not delivered to the road surface
will be deducted. The Engineer will advise the Contractor promptly, in writing, of quantities
deducted.
23088.05 BASIS OF PAYMENT.
Payment will be the contract unit price as follows:
A. Diamond Ground Shoulder Rumble Strips.
Per station for the type specified.
B. Diamond Ground Centerline Rumble Strips.
Per station for the type specified.
C. Asphalt Emulsion for Fog Seal (Shoulder Rumble Strips).
1. Per gallon for undiluted Asphalt Emulsion for Fog Seal (Shoulder Rumble Strips) that is
mixed and used on the project. Diluted asphalt emulsion that is delivered to the project site,
but not applied to the roadway surface will not be considered for payment.
2. Payment is full compensation for cleaning the shoulder surface, furnishing and applying
diluted asphalt emulsion, mixing water, and protecting the adjacent pavement and edge lines.DS-23088, Page 3 of 10
Page DeletedDS-23088, Page 4 of 10
Page DeletedDS-23088, Page 5 of 10
Page DeletedDS-23088, Page 6 of 10
Page DeletedDS-23088, Page 7 of 10
Page DeletedDS-23088, Page 8 of 10
Page DeletedDS-23088, Page 9 of 10
Page DeletedDS-23088, Page 10 of 10
- Package Files
- Name
- 15DEC114\Plan\92-C092-128-A\92-C092-128.pdf
- Bytes
- 13467876
- Name
- 15DEC114\Plan\92-C092-134\92-C092-134.pdf
- Bytes
- 18898689
- Name
- 15DEC114\Prop\DS-23052.pdf
- Bytes
- 145062
- Name
- 15DEC114\Prop\DS-23088.pdf
- Bytes
- 1371046
- Name
- 15DEC114\Prop\estprop114.pdf
- Bytes
- 254400
- Package Pages
- 23
- Categorized By
- llm
- Package Scope Docs
- 3
- Package Manifest Only
- No