- County
- CASS
- Bid Order
- 153
- Enriched
- Yes
- Projects
- FM-C015(91)--55-15
- Proposal Id
- 15-C015-091
- Letting Date
- Dec 15, 2026
- List Url Hint
- ia.iowadot.gov/contracts/biddocuments
- Package Text
- 11/10/2026 11:02 AM
CONTRACTS AND SPECIFICATIONS BUREAU
Proposal
Proposal ID: 15-C015-091 Letting Date: December 15, 2026
Call Order: 153
Proposal Work Type: HMA RESURFACING/COLD IN-PLACE RECYCLING
DBE Goal: 0.0%
Contracting Authority: CASS COUNTY
Proposal Guaranty: $125,000.00
This proposal includes the following project(s):
Project Number: FM-C015(91)--55-15 County: CASS
Project Work Type: HMA RESURFACING/COLD IN-PLACE
RECYCLING
Route: N28
Location: On N-28, from Iowa Hwy 83 N 6.7 miles to EOP near I-80 north ramp
Road System: FARM TO MARKET ROAD
Federal Aid - Wages: Non-Federal Aid - Predetermined Wages are not in Effect
Contracts and Specifications Bureau
11/10/2026 11:02 AM
Contract Time
Proposal ID: 15-C015-091 Call Order: 153 Letting Date: December 15, 2026
Site ID Site Details Liquidated
Damages
00 Late Start Date 08/16/2027 45 WORK DAYS $1,000.00
.
(*) - Indicates Cost Plus Time Site. See Schedule of Items for Cost Per Unit
Contracts and Specifications Bureau
11/10/2026 11:02 AM
Proposal ID: 15-C015-091 Call Order: 153 Letting Date: December 15, 2026
Notes
Notes :
There are no notes for this proposal.
Contracts and Specifications Bureau
11/10/2026 11:02 AM
Proposal Specifications List
Proposal ID: 15-C015-091 Call Order: 153 Letting Date: December 15, 2026
Note Description
001.2023 *** STANDARD SPECIFICATIONS -- SERIES 2023 ***
The Iowa Department of Transportation STANDARD SPECIFICATIONS FOR
HIGHWAY AND BRIDGE CONSTRUCTION, SERIES 2023, plus applicable General
Supplemental Specifications, Developmental Specifications, Supplemental
Specifications AND Special Provisions shall apply to construction work on this contract.
Contracts and Specifications Bureau
11/10/2026 11:02 AM
Proposal Specifications List
Proposal ID: 15-C015-091 Call Order: 153 Letting Date: December 15, 2026
Note Description
005.1107.02 *** Revisions to Article 1107.02 ***
Article 1107.02, Insurance, is amended by the following modifications and additions.
This proposal note becomes null and void January 1, 2027.
A. It shall be the Contractor's responsibility to have liability insurance covering all
of the construction operations incident to contract completion and the Contractor must
have on file with the Contracting Authority a current "Certificate of Insurance" prior to
award of contract. The certificate shall identify the insurance company firm name and
address, Contractor firm name, policy period, type of policy, limits of coverage, and
scope of work covered (single contract or statewide). This requirement shall apply with
equal force, whether the work is performed by persons employed directly by the
Contractor including a subcontractor, persons employed by a subcontractor, or by an
independent contractor.
B. In addition to the above, the Contracting Authority shall be included as an
insured party, or a separate owner's protective policy shall be filed showing the
Contracting Authority as an insured party.
C. The liability insurance shall be written by an insurance company (or
companies) qualified to do business in Iowa. For independent contractors engaged
solely in the transportation of materials, the minimum coverage provided by such
insurance shall be not less than that required by Chapter 325A, Code of Iowa, for such
truck operators or contract carriers as defined therein. For all other contractors,
subcontractors, independent contractors, and the Contracting Authority, the minimum
coverage by such insurance shall be as follows:
General Liability, Including: BODILY INJURY
Independent Contractors $500,000 Each Occurrence
Contractual Liability, $500,000 Aggregate
Products and Completed PROPERTY DAMAGE
Operations $250,000 Each Occurrence
$250,000 Aggregate
or
BODILY INJURY AND PROPERTY DAMAGE
- COMBINED SINGLE LIMIT*
$750,000 Each Occurrence
$750,000 Aggregate
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
Contracts and Specifications Bureau
11/10/2026 11:02 AM
Proposal Specifications List
Proposal ID: 15-C015-091 Call Order: 153 Letting Date: December 15, 2026
Note Description
*A comprehensive Catastrophe Liability Policy (Umbrella) can be used to aid in
achieving the minimum required limits.
D. Failure on the part of the Contractor to comply with the requirements of this
article will be considered sufficient cause to suspend the work, withhold estimates, and
to deny the Contractor from receiving further contract awards, as provided in Article
1103.01.
500.01 *** WINTER WORK ***
The free time allowed between November 15 and April 1 will not be permitted on this
project. The Contractor shall work during the winter on all working days as defined in
Article 1101.03 'Working Day'.
GS-23007 GENERAL SUPPLEMENTAL SPECIFICATIONS FOR HIGHWAY AND BRIDGE
CONSTRUCTION, OCTOBER 20, 2026 RELEASE
Contracts and Specifications Bureau
11/10/2026 11:02 AM
Proposal Schedule of Items
Proposal ID: 15-C015-091 Call Order: 153 Letting Date: December 15, 2026
SECTION: 0001
ROADWAY ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0010 2121-7425020 7,000.000
GRANULAR SHOULDERS, TYPE B TON _________._____ _________._____
0020 2214-5145150 2,946.000
PAVEMENT SCARIFICATION,
NOMINAL THICKNESS
SY _________._____ _________._____
0030 2303-1032500 7,200.000
HOT MIX ASPHALT STANDARD
TRAFFIC, INTERMEDIATE COURSE,
1/2 IN. MIX
TON _________._____ _________._____
0040 2303-1033500 7,000.000
HOT MIX ASPHALT STANDARD
TRAFFIC, SURFACE COURSE, 1/2 IN.
MIX, NO SPECIAL FRICTION
REQUIREMENT
TON _________._____ _________._____
0050 2303-1258283 850.000
ASPHALT BINDER, PG 58-28S,
STANDARD TRAFFIC
TON _________._____ _________._____
0060 2303-6911000
HOT MIX ASPHALT PAVEMENT
SAMPLES
LUMP SUM LUMP SUM _________._____
0070 2303-7000610 20,000.000
PAYMENT ADJUSTMENT
INCENTIVE/DISINCENTIVE FOR HMA
MIXTURE LABORATORY VOIDS
(FORMULA - BY PAY FACTOR)
EACH 1.00000 20,000.00
0080 2303-7000620 20,000.000
PAYMENT ADJUSTMENT
INCENTIVE/DISINCENTIVE FOR HMA
MIXTURE FIELD VOIDS (FORMULA -
BY PAY FACTOR)
EACH 1.00000 20,000.00
0090 2303-9091010 2.000
RUMBLE STRIP PANEL (HMA
SURFACE)
EACH _________._____ _________._____
Contracts and Specifications Bureau
11/10/2026 11:02 AM
Proposal Schedule of Items
Proposal ID: 15-C015-091 Call Order: 153 Letting Date: December 15, 2026
SECTION: 0001
ROADWAY ITEMS
Proposal
Line
Number
Item Number
Item Description
Item Quantity
and Units
Unit Price Bid Amount
Dollars Cents Dollars Cents
0100 2318-1001100 78,895.000
COLD IN-PLACE RECYCLED ASPHALT
PAVEMENT
SY _________._____ _________._____
0110 2318-1001220 316.000
ASPHALT STABILIZING AGENT
(FOAMED ASPHALT)
TON _________._____ _________._____
0120 2527-9263209 210.600
PAINTED PAVEMENT MARKINGS,
WATERBORNE OR SOLVENT-BASED
STA _________._____ _________._____
0130 2528-8445110
TRAFFIC CONTROL LUMP SUM LUMP SUM _________._____
0140 2528-8445113 50.000
FLAGGERS EACH 660.00000 33,000.00
0150 2528-8445115 10.000
PILOT CARS EACH 990.00000 9,900.00
0160 2533-4980005
MOBILIZATION LUMP SUM LUMP SUM _________._____
Section: 0001 Total: _________._____
Total Bid: _________._____
- Package Files
- Name
- 15DEC153\Plan\15-C015-091\15-C015-091.pdf
- Bytes
- 1918729
- Name
- 15DEC153\Prop\estprop153.pdf
- Bytes
- 217673
- Package Pages
- 8
- Categorized By
- llm
- Package Scope Docs
- 1
- Package Manifest Only
- No