Project Summary: The City of Houston (“City”) seeks proposals from qualified Proposers to provide construction, repair, rehabilitation, removal, disposal, and replacement services for roadway pavement and associated improvements. The scope of work will be defined through individual Work Authorizations. The Contractor may also be required to construct, repair, or replace curbs, gutters, sidewalks, and ADA‑compliant wheelchair ramps. Work Order projects will be performed at various locations throughout the City of Houston.
Estimated Construction Budget: $10,000,000.00
NIGP Code: 745-05, 745-02, 929-12
WBE Goal: 3%
SBE Goal: 11%
For information related to bid opening, please visit the following link: Strategic Procurement Division's Bid Opening
The Contractor will perform construction, repair, rehabilitation, removal, disposal, and replacement services for roadway pavement and associated improvements, defined through individual Work Authorizations. The Contractor may also be required to construct, repair, or replace curbs, gutters, sidewalks, and ADA-compliant wheelchair ramps. Work Order projects will be performed at various locations throughout the City of Houston.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
{"type":"document-upload","prompt":"Required forms listed within the CSP to be included with the bid.\nTab 9 - Forms and Certifications","required":true,"attachments":[{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058609650_98c8e779-1c8a-4eb3-aa52-5844d6b35058/00430-BiddersBond.pdf","name":"00430 - Bidders Bond.pdf","type":"application/pdf","bytes":112449,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:23:30.784Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058615532_10e31b5c-baad-4db2-8056-34227dfb4211/00470-BiddersMWSBEParticipationPlan.pdf","name":"00470 - Bidder's MWSBE Participation Plan.pdf","type":"application/pdf","bytes":271823,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:23:36.576Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058625163_fb759923-39b0-4fc8-9a22-c27e49bd169e/00471-Pre-BidGoodFaithEfforts.pdf","name":"00471 - Pre-Bid Good Faith Efforts.pdf","type":"application/pdf","bytes":280520,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:23:46.672Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1777058634200_8cc02e17-a73d-4e53-8dda-b434e0f8e2d5/00472-GoalDeviationRequest.pdf","name":"00472 - Goal Deviation Request.pdf","type":"application/pdf","bytes":204522,"bucket":"documents.beaconbid.com","createdAt":"2026-04-24T19:23:54.833Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778176603484_c0c35a1c-c019-4bac-be89-b6958fbe57bb/00604-HistoryofOSHAActionsandListofOn-The-Job-Injuries.doc","name":"00604 - History of OSHA Actions and List of On-The-Job-Injuries.doc","type":"application/msword","bytes":28160,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T17:56:44.743Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778176619371_da08af5c-e30b-4af6-b090-55383b08d4b3/ExhibitI-OfferandSubmittalReferencesCSP.docx","name":"Exhibit I - Offer and Submittal, References (CSP).docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":28938,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T17:56:59.995Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1781619868562_9c83ead9-026b-414c-a2e2-a6d461cb78bc/ExhibitII-HireHoustonFirst.docx","name":"Exhibit II - Hire Houston First.docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":29621,"bucket":"documents.beaconbid.com","createdAt":"2026-06-16T14:24:29.557Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778176628354_06d2ff2e-1dcd-4bfd-9f85-22a39ee3b3ba/ExhibitIII-OwnershipInformationForm.docx","name":"Exhibit III - Ownership Information Form.docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":56768,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T17:57:08.859Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778176628561_9ec19b94-9615-4fe2-a41d-ae53f63b1a54/ExhibitIV-Anti-CollusionStatementCSP.docx","name":"Exhibit IV - Anti-Collusion Statement (CSP).docx","type":"application/vnd.openxmlformats-officedocument.wordprocessingml.document","bytes":21260,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T17:57:08.960Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778176642339_4d36233d-f9a6-4876-82ef-aa6cedf9fc96/ExhibitV-ConflictofInterestQuestionnaire.pdf","name":"Exhibit V - Conflict of Interest Questionnaire.pdf","type":"application/pdf","bytes":61154,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T17:57:22.992Z","documentSource":"s3"},{"key":"agency/281287c2-49c0-439e-81d7-315d13b0b4fb/form-attachment/1778176642351_bf4ffa39-7aba-4427-b959-e532da8f3c0d/Pay-or-PlayPOP1.pdf","name":"Pay-or-Play (POP) 1.pdf","type":"application/pdf","bytes":99812,"bucket":"documents.beaconbid.com","createdAt":"2026-05-07T17:57:23.058Z","documentSource":"s3"}]}{"id":"2021a93b-26ae-4dc8-b69e-8791ef44ce42","type":"document-upload","prompt":"Attach response to Tabs 1 - 8 related to Part 5, Section 2.0 in the CSP. \nTab 1 - Cover Letter\nTab 2 - Executive Summary\nTab 3 - General Company Information\nTab 4 – Qualifications of Key Personnel/Team Structure\nTab 5 – Experience with Similar Projects/References/Safety: \nTab 6 – Project Approach\nTab 7 - Legal Actions: \nTab 8 - Conflict of Interest","required":true,"attachments":[]}{"id":"4124063b-428d-4b2d-a845-5d2e15088b23","type":"document-upload","prompt":"Attach response to Tab 10 related to Part 5, Section 2.0 in the CSP. \nTab 10 - Financial Stability documents","required":true,"attachments":[]}{"id":"4062dca3-8e37-4e15-b7d3-3538720aad74","name":"Mobilization (percentage per work order)","notes":"1502","details":"","quantity":" 1 ","quantityType":"LS","estimatedValue":" $400,000.00 "}{"name":"Traffic control and regulation, includes flagman and uniformed police officer if required (percentage per work order)","notes":"1555","quantity":" 1 ","quantityType":"LS","estimatedValue":" $300,000.00 "}{"name":"Tree and plant protection","notes":"1562","quantity":" 1 ","quantityType":"LS","estimatedValue":" $30,000.00 "}{"colId":"name"}{"colId":"notes","hidden":false,"headerName":"Control No."}{"colId":"details","hidden":true}{"colId":"quantity"}{"colId":"quantityType"}{"colId":"estimatedValue","hidden":false,"headerName":"Fixed Price"}{"colId":"response.unitPrice","hidden":true}{"colId":"response.markupPercent","hidden":true}{"colId":"response.notes"}{"colId":"response.nobid","hidden":true}{"id":"f943e726-03bc-4d31-8eab-0d7e36759d9e","name":"Inlet Protection Barrier-All types","notes":"1571","details":"","quantity":" 1 ","quantityType":"LF"}{"name":"Adjust existing manhole frame and cover to new grade","notes":"2086","quantity":" 1 ","quantityType":"EA"}{"name":"Remove and replace concrete meter box (all sizes complete in place)","notes":"2086","quantity":" 1 ","quantityType":"EA"}{"name":"Adjust existing valve box to new grade","notes":"2086","quantity":" 1 ","quantityType":"EA"}{"name":"Repair/adjust existing inlet top (with new cover if necessary)","notes":"2086","quantity":" 1 ","quantityType":"EA"}{"name":"Remove and dispose of asphaltic surface with or without base including sawcutting","notes":"2221","quantity":" 1 ","quantityType":"SY"}{"name":"Remove railroad tracks from roadway","notes":null,"quantity":" 1 ","quantityType":"LF"}{"name":"Remove and dispose of soil for positive drainage from roadway to ditch","notes":"2315","quantity":" 1 ","quantityType":"CY"}{"name":"Remove and dispose of concrete sidewalk, driveways, and ramps, all thicknesses","notes":"2221","quantity":" 1 ","quantityType":"SY"}{"name":"Remove and dispose of concrete curb or curb and gutter","notes":"2221","quantity":" 1 ","quantityType":"LF"}{"name":"Remove and dispose of reinforced concrete pavements (including all thickness, with or w/o asphalt, including base & subgrade, w/ or w/o curb, all depths) measured from back-to-back of curb","notes":"2221","quantity":" 1 ","quantityType":"SY"}{"name":"Milling asphalt pavement, all thicknesses","notes":"2960","quantity":" 1 ","quantityType":"SY"}{"name":"Recycled crushed concrete base course (Required for all depths, including excavation)","notes":"2713","quantity":" 1 ","quantityType":"TON"}{"name":"Type A or B hot-mix asphaltic base course, all thicknesses","notes":"2711","quantity":" 1 ","quantityType":"TON"}{"name":"Type D hot-mix asphaltic surface, all thicknesses","notes":"2741","quantity":" 1 ","quantityType":"TON"}{"name":"Premium cost for night work - Type A or B","notes":"2711","quantity":" 1 ","quantityType":"TON"}{"name":"Premium cost for night work - Type D","notes":"2741","quantity":" 1 ","quantityType":"TON"}{"name":"Reinforcement Grid for Asphalt Pavement","notes":"TxDOT SS 3011","quantity":" 1 ","quantityType":"SY"}{"name":"6-inch concrete driveway including excavation, subgrade, sawcutting and all joints","notes":"2754","quantity":" 1 ","quantityType":"SF"}{"name":"7-inch concrete driveway including excavation, subgrade, sawcutting and all joints","notes":"2754","quantity":" 1 ","quantityType":"SF"}{"name":"6-inch reinforced concrete curb and gutter","notes":"2771","quantity":" 1 ","quantityType":"LF"}{"name":"6-inch median or concrete directional islands","notes":"2772","quantity":" 1 ","quantityType":"SY"}{"name":"4 1/2-inch concrete sidewalk","notes":"2775","quantity":" 1 ","quantityType":"SF"}{"name":"Decomposed granite","notes":"TXDOT SS 2023","quantity":" 1 ","quantityType":"SY"}{"name":"Checkered plate","notes":"1562","quantity":" 1 ","quantityType":"SF"}{"name":"Wheelchair ramp / curb ramp including truncated domes, headers, sawcutting, dowels (complete in place)","notes":"2775","quantity":" 1 ","quantityType":"SF"}{"name":"Remove, Store, and Replace Irrigation Pipe, Sprinkler Heads-All Sizes & Types, & Controls (Complete in Place)","notes":" 1740 1110","quantity":" 1 ","quantityType":"LF"}{"name":"Temporary pavement markings, 4-inch painted, all colors, used at PM's direction","notes":"2765","quantity":" 1 ","quantityType":"LF"}{"name":"Temporary pavement markings, symbols, arrows, wording, painted, all colors","notes":"2765","quantity":" 1 ","quantityType":"EA"}{"name":"Reflective raised pavement markers","notes":"2764","quantity":" 1 ","quantityType":"EA"}{"name":"Thermoplastic pavement marking, 4-inch wide white/yellow, SLD/BRK","notes":"2767","quantity":" 1 ","quantityType":"LF"}{"name":"Thermoplastic pavement marking, 6-inch wide white/yellow, SLD/BRK","notes":"2767","quantity":" 1 ","quantityType":"LF"}{"name":"Thermoplastic pavement marking, 12-inch wide white/yellow","notes":"2767","quantity":" 1 ","quantityType":"LF"}{"name":"Thermoplastic pavement marking, 24-inch wide white/yellow","notes":"2767","quantity":" 1 ","quantityType":"LF"}{"name":"Thermoplastic railroad crossing pavement marking, includes symbols, stop lines and transverse lines","notes":"2767","quantity":" 1 ","quantityType":"EA"}{"name":"Thermoplastic pavement marking symbol arrow","notes":"2767","quantity":" 1 ","quantityType":"EA"}{"name":"Thermoplastic pavement marking symbol turning arrow","notes":"2767","quantity":" 1 ","quantityType":"EA"}{"name":"Thermoplastic pavement marking symbol Words & Symbols","notes":"2767","quantity":" 1 ","quantityType":"EA"}{"name":"Thermoplastic pavement marking yellow nose","notes":"2767","quantity":" 1 ","quantityType":"LF"}{"name":"Loop detector, includes saw cutting, loop wire, sealant and connections","notes":"16727","quantity":" 1 ","quantityType":"LF"}{"name":"Sodding including topsoil, watering (for 30 days) and fertilization","notes":"2922","quantity":" 1 ","quantityType":"SY"}{"name":"Clearing & Grubbing","notes":"2233","quantity":" 1 ","quantityType":"AC"}{"colId":"name"}{"colId":"notes","headerName":"Control No."}{"colId":"details","hidden":true}{"colId":"quantity"}{"colId":"quantityType"}{"colId":"estimatedValue","hidden":true}{"colId":"response.unitPrice"}{"colId":"response.markupPercent","hidden":true}{"colId":"response.notes"}{"colId":"response.nobid","hidden":true}Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: City of Houston (solicitation b79a22ef-09bc-425a-920f-34494bbc24a6), retrieved via the City of Houston BeaconBid portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.