Project Title: WWYK100209 – Repair Perimeter Dr and Industrial Blvd
Project Location: Tinker AFB
Repair Perimeter Dr and INdustrial Blvd. at Tinker Air Force Base (AFB) Oklahoma 73145
THIS POSTING IS FOR WOMEN-OWNED SMALL BUSINESSES ONLY
Only seven individuals will be allowed per prime contractor.
Site visit date will be (20 October 2026). RFIs are due on Tuesday October 27, 2026 COB. Calendar Invite will be sent to only those who have RSVPd.
The estimated price should be described in terms of the following price range: Between $5,000,000 and $10,000,000.
****ONLY WOMEN-OWNED SMALL BUSINESSES CAN ATTEND AND PROPOSE ****
The work includes asphalt overlay, concrete pavement demolition and replacement, full-depth asphalt and concrete repairs, curb and gutter work, storm drain replacement, pavement markings, and associated site work such as grading, erosion control, and installation of drainage structures. The project involves demolition of existing concrete and asphalt pavement, curb and gutter, and storm drains, followed by installation of new asphalt concrete pavement, gutters, storm drains, pavement markings, and drainage flumes. Work also includes re-grading for drainage swales, installation of silt fence, and compliance with Oklahoma Department of Transportation standard specifications.
We post new asphalt opportunities in Oklahoma as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"73145-9125""TINKER AFB""OK""USA""CP 405 739 4040""7858 5TH ST STE 1""100209 Wage Determination.pdf"1764212"file"".pdf""1""2026-10-07T18:14:51.808+00:00""e31a24b847434e2da6b7dd09f0c83fc6""public""0""public""8fe2034d3d2d4ca6aa236eeb12b589e9""0"4"0""Att10_100209_Submittal_Register.pdf"144372"file"".pdf""1""2026-10-07T18:14:51.808+00:00""e78473db6a2742a3a902efa080f285c6""public""0""public""2ae02865e09e44d7851f32e98eb51730""0"3"0""Att11_100209_Drawings.pdf"23632690"file"".pdf""1""2026-10-07T18:14:51.808+00:00""df2a7e194ac44d3b8ecb3e41ea4137c4""public""0""public""9fc5affbcbb44179a4eed935689182cf""0"2"0""Att9_100209_STATEMENT_OF_WORK.pdf"546003"file"".pdf""1""2026-10-07T18:14:51.808+00:00""a6d2453edf384e25903f325286216e20""public""0""public""fcdd1dfcb42a464da95c6b691a236d22""0"1"0"Most Oklahoma work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 4838b4b4524545218e8cfebc87bee421), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.