Patterson Pump Station Rehabilitation
Please Note:
Ineligible Source List
During the period for which a person/firm has been debarred or suspended, or placed on the Gwinnett County ineligible source list, that person/firm shall not submit or cause to be submitted offers, quotes, bids, or proposals, etc. to Gwinnett County, even when automatically or electronically distributed a notification or notified of a solicitation request. Submittals from firms currently on the Gwinnett County ineligible source list will not be considered.
CONTRACT DOCUMENTS
FOR CONSTRUCTION OF
PATTERSON PUMP
STATION
REHABILITATION
GCDWR Project No. M00748.62
BL 155-26
Volume 1 of 3
Prepared For:
Gwinnett County
Department of Water
Resources
684 Winder Highway
Lawrenceville, GA 30045
Prepared By:
Arcadis U.S., Inc.
2839 Paces Ferry Road
Suite 1000
Atlanta, GA 30339
October 2026
ISSUED FOR BID
Gwinnett County Department of Water Resources 00 11 16 - 1
Patterson Pump Station Rehabilitation (M00748.62)
Arcadis Ref. 30168590
00 11 16
INVITATION TO BID
General Notice
The Gwinnett County Board of Commissioners (Owner) is requesting Bids for the construction of the
following Project pursuant to O.C.G.A. §36-91-20:
Patterson Pump Station Rehabilitation
M00748.62
This Project includes the following Work:
The project scope includes rehabilitation of the existing Patterson Pump Station including mobilization
and demobilization, bypass pumping, demolition of facilities to be removed, excavation and grading,
structural rehabilitation of the wet well and Grinder Room, modifications to the bridge crane canopy,
installation of slide gates, a carbon filter odor control system and associated ductwork, gravity sewer with
new Diversion Structure, recoating of all piping in the wet well and valve vault, generator enclosure, and
existing surge tank, associated site improvements and other facility upgrades per contract documents
including site concrete paving, site fencing, an asphalt access driveway, finish grading, erosion control
and site stabilization, and all related appurtenances for a complete and functioning system.
The Project is to be substantially complete and ready for operation within 550 days after the date when
the Contract Times commence to run as provided in the General Conditions.
The project scope includes rehabilitation of the existing Patterson Pump Station including mobilization and demobilization, bypass pumping, demolition of facilities to be removed, excavation and grading, structural rehabilitation of the wet well and Grinder Room, modifications to the bridge crane canopy, installation of slide gates, a carbon filter odor control system and associated ductwork, gravity sewer with new Diversion Structure, recoating of all piping in the wet well and valve vault, generator enclosure, and existing surge tank, associated site improvements and other facility upgrades per contract documents including site concrete paving, site fencing, an asphalt access driveway, finish grading, erosion control and site stabilization, and all related appurtenances for a complete and functioning system.
We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-77023-NONST-2027-000000794), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.