Union County is requesting proposals from Georgia State licensed contractors to replace the Spiva Cove Bridge and repair a culvert on Kiutuestia Creek Road at Lows Mill Road in Union County.
1010 Commerce Dr
Bogart, GA 30622
Phone: (770) 725-1200
Fax: (770) 725-1204
Developer: Union County Government
Project: 26013UCGD
Location: Union County, Ga
Date: 10/5/2026
Item No. Quantity Unit Unit Price Total Price Notes
SITEWORK
1.0 Culvert Repair
1.1 Clearing and Grubbing 1.0 LS $ $ Clear vegetation within 10' of wall
1.2 Wingwall Stabilization and Repair 1.0 LS $ $
1.3 Compaction Grouting 1.0 LS $ $ As Needed
1.4 Flume Installation 1.0 LS $ $
1.5 Riprap Scour Protection 45.0 TONS $ $ Type 1 Riprap with Non-woven, Needle-Punched Filter Fabric
1.6 Synthetic Hydrotex Grout Bags 3.0 CY $ $ Assume 3 CY of flowable fill or lean concrete
1.7 Fine Aggregae Concrete 1.0 LS $ $ Fill below Existing Culvert
SUB-TOTAL = $
MISCELLANEOUS
2.0 Construction General
2.1 Mobilization 1 JOB $ $
2.2 Traffic Control 1 JOB $ $
SUBTOTAL $
CONSTRUCTION TOTALS
ESTIMATED SUBTOTAL $
ESTIMATED CONTENGENCIES (10%) $
TOTAL ESTIMATED CONSTRUCTION COST $
GENERAL NOTES
Unit Abbreviation Unit Type
LS Single
Payment
AC Area
CY Volume
GLF Length
LF Length
EA Number
SY Area
TONS Weight
JOB Single
Payment
GL Volume
UNION COUNTY GOVERNMENT
KIUTUSTIA CREEK ROAD
MATERIAL QUANITIES AND COST ESTIMATE
GDOT Item Description
Unit Price Decriptions
1010 Commerce Drive ■ Bogart, GA 30622 ■ P:770.725.1200 ■ www.CarterEngineering.com
The Work is construction and services to replace the Spiva Cove Bridge and repair a culvert on Kiutuestia Creek Road at Lows Mill Road, including demolition, 80-foot by 14-foot bridge with concrete abutments, wingwalls and decking, base and asphalt paving, grading, riprap scour protection, wingwall stabilization, compaction grouting, flume installation, grout bags, concrete fill, mobilization, traffic control and erosion control, with all materials and services necessary for completion.
We post new concrete opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-74400-NONST-2026-000000012), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.