Construction of a 48" RCP culvert with GDOT standard headwall with parapets, energy dissipaters, and aprons, rip rap, proposed detention pond construction with OCS erosion control measures and storm drain infrastructure, traffic control, and all other necessary appurtenances for a complete job.
ADVERTISEMENT FOR BIDS
Sealed bids will be received for the OneGeorgia Disaster Relief- Rigsbee Area, at Vidalia
City Hall, 302 E First Street, Suite C, Vidalia, Georgia 30474 on December 16, 2026 at 11:00
am (Local Time), at which time they will be publicly opened and read.
The work under this Contract will consist generally of the following:
The construction of a 48” RCP culvert with GDOT standard headwall with parapets,
energy dissipaters, and aprons, rip rap, proposed detention pond construction with OCS erosion
control measures and storm drain infrastructure, traffic control, and all other necessary
appurtenances for a complete job.
All work on the Project must be completed within 180 consecutive calendar days of date
of notice to proceed.
Bid shall be submitted on Bid Proposal Forms furnished for that purpose, in accordance
with the Contract Documents and the Plans and Specifications which are on file and may be
reviewed (by appointment only) at the office of Hofstadter and Associates, Inc., Consulting
Engineers, 4571 Arkwright Road, Macon, Georgia 31210.
Copies of Bid Forms, Plans, Specifications and Contract Documents may be obtained
from Hofstadter and Associates, Inc., upon deposit of $200.00 per .pdf set. No refunds will be
made for returned documents.
No bid will be considered unless sealed and filed with Vidalia prior to the time set forth
above, and accompanied by a Bidder's Bond, payable to Vidalia for 10 percent of the amount of
the bid; to be forfeited as liquidated damages in the event that the bid be accepted and the bidder
fail to enter promptly into a written contract and furnish the required Payment Bond and
Performance Bond and Insurance Certificates. Bids arriving after the designated time will be
returned unopened.
The work consists of construction of a 48" RCP culvert with GDOT standard headwall with parapets, energy dissipaters, and aprons, rip rap, proposed detention pond construction with OCS erosion control measures and storm drain infrastructure, traffic control, and all other necessary appurtenances for a complete job.
We post new plumbing opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-73850-NONST-2027-000000023), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.