Spalding County is accepting sealed bids from qualified contractors for the DEMOLITION OF THE FORMER DUNDEE MILL HEADQUARTERS, 349 Railroad Avenue, Griffin, Georgia 30223 (Tax Parcel 109 01015), located at the intersection of Railroad Avenue and Cheatham Street. This work is undertaken pursuant to a court order in Spalding County, Georgia v. Real Property Located at 349 Railroad Avenue et al., Magistrate Court of Spalding County, Civil Action No. 25-S-2412, declaring the property a public nuisance and authorizing the County to enter the property and abate the nuisance. Bids will be received no later than September 23, 2026, at 2:00 PM, by Mitzy Campbell, Spalding County Purchasing Officer. Bids received after the above date and time, or in any location other than the Purchasing Department, will not be considered.
CLIENT PROJECT:
LAB CODE:
June 18, 2026
Curtis Moses
Nova Engineering & Environmental, LLC
3900 Kennesaw 75 Pkwy, Suite 100
Kennesaw, GA 30144
Dundy Mill, Dundy Mill
758061-1
Dear Curtis,
Enclosed are asbestos analysis results for PLM Bulk samples received at our laboratory on 06/11/26. The
samples were analyzed for asbestos using polarizing light microscopy (PLM) per the EPA 600/R-93/116: Method
for the Determination of Asbestos in Bulk Building Materials and EPA 40 CFR Appendix E to Subpart E of Part
763: Interim Method of the Determination of Asbestos in Bulk Insulation Samples.
Sample results containing >1% asbestos are considered asbestos-containing materials (ACMs) per EPA
regulatory requirements. The detection limit for the EPA 600 Method is <1% by calibrated visual estimate.
Thank you for your business and we look forward to continuing good relations.
Kind Regards,
Kamila Reichert,
Laboratory DirectorNVLAP 102082-03785 Presidential Parkway Suite 130, • Atlanta, GA 30340 • (770) 368-2171
ASBESTOS ANALYTICAL REPORT
By: Polarized Light Microscopy
Prepared for
Nova Engineering & Environmental, LLC
CLIENT PROJECT: Dundy Mill, Dundy Mill
LAB CODE: 758061-1
TEST METHOD: EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to
Subpart E of Part 763
REPORT DATE: 06/18/26
TOTAL SAMPLES ANALYZED: 35
TOTAL LAYERS ANALYZED: 603785 Presidential Parkway Suite 130, • Atlanta, GA 30340 • (770) 368-2171
Project: Dundy Mill, Dundy Mill
Method:
Asbestos Report Summary
By: Polarized Light Microscopy
758061-1Lab Code:
EPA 600 / R93 / 116 and EPA 40 CFR Appendix E to Subpart E of Part 763Client IDClient IDClient IDClient ID Lab IDLab IDLab IDLab ID LayerLayerLayerLayer Sample DescriptionSample DescriptionSample DescriptionSample Description Asbestos %Asbestos…
We post new structural work opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: Georgia Procurement Registry (solicitation PE-72600-NONST-2027-000000051), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.