The Peachtree City Airport Authority located in Peachtree City, Georgia requests "Statements of Qualifications' from qualified firms to engage in services of a consulting firm for engineering services in connection with the Airport Capital Improvement Plan at Atlanta Regional Airport – Falcon Field. Notices of Requests for Statements of Qualifications will only be provided to consulting firms that are currently Area Classes No. 2.09 Aviation Design, No. 8.02 Airport Construction Administration and Observation, and No. 2.09b Airport Design – Electrical. The complete Request for Qualifications may be obtained by sending an email with subject name "REQUEST FOR QUALIFICATIONS' to hope@kffc.org.
This is NOT a request for a priced proposal. Statements must be sealed, delivered via mail or in person, and marked "Airport Consulting Engineering Services Areas 2.09, 2.09b, and 8.02" on the outside of the envelope. Statements of Qualifications must be received at Atlanta Regional Airport – Falcon Field, 7 Falcon Drive, Peachtree City, GA 30269 by no later than 12:00 p.m. on December 16, 2026.
Late responses will not be considered.
The consultant will provide professional services for the engineering and architectural elements of identified projects in the FY2027-2031 Capital Improvement Plan. Services include topographic and engineering surveys, geotechnical investigations, pavement and drainage analyses, preliminary and final plans, specifications, estimates, safety and phasing plans, and permitting support for runway, taxiway, apron, lighting, roadway, utility, fuel farm, fencing, obstruction removal, and tower improvements. The consultant will also provide bid documents, bid assistance and recommendations, construction administration, qualified resident observation and inspection, materials testing coordination, payment and change order review, record drawings, grant closeout support, and commissioning coordination. Additionally, the consultant will provide appropriately licensed architectural, structural, electrical, and other specialists for tower and facility elements.
We post new architecture and design opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-66888-NONST-2027-000000007), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.