The work to be performed by the General Contractor consist of but is not limited to the following major
items: – TRAFFIC CONTROL following MUTCD Standards. – EROSION CONTROL BMP's including silt fence and portable concrete washout. – SITE WORK including demolition of curb and gutter, and asphalt, grading and excavation. – CONCRETE PAVING including construction of concrete curb & gutter. – ASPHALT PAVING installation.
PROJECT MANUAL
FOR THE
CITY OF LAWRENCEVILLE
822 Leonard Court Sinkhole Repair
LAWRENCEVILLE, GA
SB011-27
OWNER
70 S. CLAYTON STREET
LAWRENCEVILLE, GA 30046
August 2026
TABLE OF CONTENTS
TOC-i
822 Leonard Court Sinkhole Repair
SB011-27
TABLE OF CONTENTS
SECTION TITLES PAGES
I. BIDDING REQUIREMENTS
SECTION 00100 – NOTICE OF BID ................................................................................00100-1 to 00100-2
SECTION 00200 – INSTRUCTIONS TO BIDDERS .......................................................00200-1 to 00200-6
SECTION 00300 – STATEMENT OF EQUIPMENT 00300-1
SECTION 00410 – BIDDING FORM ...............................................................................00410-1 to 00410-6
SECTION 00430 – BID BOND.........................................................................................00430-1 to 00430-2
SECTION 00440 – STATEMENT OF BIDDER’S QUALIFICATONS ..........................00440-1 to 00440-4
SECTION 00480 – NON-COLLUSION AFFIDAVIT ........................................................................ 00480-1
II. CONTRACT FORMS
SECTION 00520 – SAMPLE CONTRACT FORM .........................................................00520-1 to 00520-3
SECTION 00610 – PERFORMANCE BOND ..................................................................00610-1 to 00610-3
SECTION 00620 – PAYMENT BOND ............................................................................00620-1 to 00620-3
SECTION 00630 – CONTRACTOR AFFIDAVIT AND AGREEMENT ........................................... 00630-1
III.
The work to be performed by the General Contractor consists of but is not limited to: TRAFFIC CONTROL following MUTCD Standards; EROSION CONTROL BMP's including silt fence and portable concrete washout; SITE WORK including demolition of curb and gutter, and asphalt, grading and excavation; CONCRETE PAVING including construction of concrete curb & gutter; ASPHALT PAVING installation. Specific bid items include Mobilization, Clearing & Grubbing; Traffic Control & Staging; Erosion Control; Demolition; Earthfill & Fine Grading; Hydro-Excavation; Utility temporary set-up and re-installation; Borrow Excavation; Rolled Concrete Curb & Gutter; Sod; Asphalt Patch; and Warranties & Bonds.
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-66751-NONST-2027-000000107), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.