Work to be done shall consist of the construction of a permanent 2,000 GPM deep well and furnishing all products and performing all labor necessary to construct the Chemical Feed Building, Well Enclosure Building, Chlorine Storage Building, and Fluoride Storage Enclosure.
Work to be done shall consist of the construction of a permanent 2,000 GPM deep well and furnishing all products and performing all labor necessary to construct the Chemical Feed Building, Well Enclosure Building, Chlorine Storage Building, and Fluoride Storage Enclosure. Construction shall consist of the installation of a new deep well to the depth and diameter as required in the Construction Drawings and Technical Specifications. In general, the well construction will include drilling a 46" Dia. Hole, installing 40" surface casing, 30" outer casing, 24" inner casing, 250-HP Vertical Turbine Pump, motor, valves, yard piping, painting, videotaping, logging and performing a 24-hour pump test, site work, electrical and all other appurtenances necessary to complete the Work as described in the Construction Drawings and Technical Specifications. Minimum depth of the well is expected to be +/- 500 feet. The work will be awarded in one (1) contract with a contract time of 360 days.
We post new excavating opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-66166-NONST-2027-000000055), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.