QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I
QBS/PS/DOT/2609-1270086/Marietta
Road Bridge Replacement Over CSX -
Phase I
10/21/26 4:05 PM
REQUEST FOR QUALIFICATIONS
QBS/PS/DOT/2609-1270086/Marietta Road
Bridge Replacement Over CSX Railroad -
Phase I
Solomon Caviness
1
QBS/PS/DOT/2609-1270086/Marietta
Road Bridge Replacement Over CSX -
Phase I
10/21/26 4:05 PM
Commissioner
Department of Transportation
Chandra Houston
Chief Procurement Officer
Department of Procurement
2
QBS/PS/DOT/2609-1270086/Marietta
Road Bridge Replacement Over CSX -
Phase I
10/21/26 4:05 PM
Table of Contents1 Requirements................................................................................................................................................................41.0.1 Section 1. Solicitation Requirements.................................................................................................................4
3
QBS/PS/DOT/2609-1270086/Marietta
Road Bridge Replacement Over CSX -
Phase I
10/21/26 4:05 PM
1 Requirements
*Response is required
0.1 Section 1. Solicitation Requirements
1.
Method of Source Selection and Applicable Law: This Request for Proposals ("RFP") is
issued by the City of Atlanta (the "City") pursuant to the procedures specified in 40 US
Code 1101-1104 (Brooks Act) and 23 CFR Part 172. The City is soliciting Statements of
Qualifications (SOQs) from qualified firm(s) or organization(s). By submitting an SOQ in
response to this solicitation, an offeror (herein called a "Proponent") acknowledges
familiarity with all laws applicable to this procurement.
About this Solicitation
This solicitation process involves:
• Statement of Qualifications (SOQ): focuses on qualifications and experience.
• Evaluation: focuses on technical approach, workload capacity, and past performance.
Replace the existing 423.5 feet long, 5 span concrete box beam Marietta Road bridge, built in 1971 and signed at 10 tons, with a new structure, pavement, curb and gutter, and a continuous 5-foot sidewalk on each side. The project also includes a continuous standard 5-foot sidewalk along Marietta Road from south of the bridge to Perry Boulevard/West Marietta Street, about 0.8 mile.
We post new architecture and design opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Required by the city at the permit stage, not with your bid. Inferred from where the work happens — confirm forms and amounts with the permit office before you start.
Source: Georgia Procurement Registry (solicitation PE-66062-NONST-2027-000000510), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.