The City of Atlanta, on behalf of the Department of Transportation (DOT), will soon initiate a Multi-Step Sealed
Bid process consisting of an initial prequalification phase followed by an Request for Proposal (RFP) to engage
qualified contractors. The project scope includes expanding sidewalks along SR 154/Memorial Drive between
Connally Street and Grant Street to reconnect missing, broken, or damaged sidewalk segments and upgrade
facilities to ADA standards where required. Existing curbs will remain where feasible, and a planting strip will be
installed between the new sidewalks and the existing curb at radius returns. This procurement aims to enhance
pedestrian accessibility along a rapidly evolving corridor by improving sidewalk connectivity, upgrading ADA
compliance, and reducing pedestrian crashes through the installation of planting strips. The City expects selected
contractor(s) to deliver timely, coordinated, and high-quality services while minimizing disruption within the work
area. Vendors with the capacity to provide dependable technical expertise, maintain adequate staffing, and support
both planned and operationally sensitive work are encouraged to participate. A Pre Solicitation Conference will be
announced and held to offer additional information about the upcoming solicitation, clarify the anticipated scope,
and address vendor questions
APPENDIX B
INSURANCE & BONDING REQUIREMENTS
RFP/PS/DOT/2605-1260223
SR-154 Memorial Drive Corridor
A. Preamble
The following requirements apply to all work under the agreement. Compliance
is required by all Contractors/Consultants. To the extent permitted by applicable law,
the City of Atlanta (“City”) reserves the right to adjust or waive any insurance or
bonding requirements contained in this Appendix B and applicable to the
agreement.
The project will expand sidewalks on SR 154/Memorial Drive between Connally Street and Grant Street to reconnect missing, broken, or damaged sidewalk segments and upgrade facilities to ADA standards where required. Existing curbs will remain where feasible, and a planting strip will be installed between the new sidewalks and the existing curb at radius returns. The procurement aims to enhance pedestrian accessibility, improve sidewalk connectivity, upgrade ADA compliance, and reduce pedestrian crashes through the installation of planting strips.
We post new asphalt opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Georgia Procurement Registry (solicitation PE-66062-NONST-2027-000000471), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.