Light RFP
Georgia · Atlanta, GA

IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3

Due Aug 3, 2026·6 days left·Paving / SidewalksView official posting ↗
Issuing agency
City of Atlanta
Method
Competitive Sealed Bid
Category
All Categories
PIN
PE-66062-NONST-2027-000000440
Location
Atlanta, GA
Posted
Jul 2, 2026
Takeaways by LightRFP AI
  • The City of Atlanta is seeking bids for 2025 LMIG Street Resurfacing Group 3, a construction project for public right-of-way improvements.
  • The work includes 4.32 centerline miles (16.59 lane miles) of asphalt resurfacing, milling, point repairs, striping, ADA ramp upgrades, and utility structure adjustments.
  • The solicitation is issued by the City of Atlanta as a Competitive Sealed Bid.
  • The place of performance is Atlanta, GA.
  • Bids are due by August 3, 2026 at 2:00 PM ET, and the posting date is July 2, 2026.
  • The buyer contact is Bonnie Davis, reachable at bdavis@atlantaga.gov or (404) 327-1625.
  • Requirement: Performance and Payment Bonds are required, with their cost to be distributed through the various items of work.
  • Requirement: Liquidated damages in the amount of $1,000.00 per calendar day shall apply for each calendar day that substantial completion is delayed.
  • Requirement: Work must be performed in accordance with Georgia Department of Transportation (GDOT) Standard Specifications.

AI-generated, verify all details against the official documents.

Description

This project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT standards and specifications.

EXHIBIT – A
GENERAL SCOPE OF SERVICES
GROUP – 3

SCOPE OF WORK, SCHEDULE OF QUANTITIES, AND PRICES – Group 3
1.0 SCOPE OF WORK
The scope of work for this project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of
asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp
installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch
Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT
standards and specifications. The quantities of the improvements are listed on the bid for pricing. Project List attached along with
mix type and spread rate.
On Street Quad From Street To Street Mix Type
Spread
Rate
BENJAMIN E MAYS DRIVE SW FAIRBURN ROAD CASCADE ROAD 12.5MM 220
GREENBRIAR PARKWAY SW CAMPBELLTON ROAD
CONTINETAL COLONY
PARKWAY 12.5MM 220
LAKEWOOD AVENUE SE MACON DRIVE CLAIRE DRIVE 12.5MM 220
Variable depth Milling of 1½ inches to 2 inches of existing pavement and overlay with 1½ inches to 2 inches of 12.5mm (as noted
on the attached, but not limited to this project list) with point patching and levelling performed as needed to prevent water
accumulation on pavement, restore proper grade and / or transverse slope for positive drainage. The CONTRACTOR will need to
make safe any utilities exposed as a result of deep patching / milling as directed by the Engineer.
2.0 MILESTONES AND LIQUIDATED DAMAGES
Contractor shall complete the work in accordance with the milestones set forth in Exhibit A.3 of the Agreement. Time is of the
essence under this Agreement. The Failure to meet any milestone or any substantial completion deadline, with

Documents1
Document 1Link

Contact

Name
Bonnie Davis
Phone
(404) 327-1625
Address
Atlanta, GA
Full source recordfrom Georgia Procurement Registry
Title
IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3
Detail
Fields
Invite
Invite ' + value.companyName + ' ' + value.contactName + ' '; }); htmlData = htmlData + ' '; showPopup( '', htmlData); } } } else { showPopup( "", "Error in searching vendor contact."); } initiateSelfInvite(); }); } else { showPopup("", "Please enter a valid email address."); } }); $(".attachDownLink").on( "click", function() { $("#attachmentId").val( $(this).attr("data-attachmentId")); $("#sourceSystemType").val( $(this).attr( "data-sourceSystemType")); var requestTime = new Date().getTime(); if (attachmentId && sourceSystemType) { $.post("./downloadAttachment?" + requestTime, { attachmentId : attachmentId, sourceSystemType : sourceSystemType }, function(data) { }); } }); }); IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3 Start Date: Jul 02, 2026 @ 03:26 PM ET End Date: Aug 03, 2026 @ 02:00 PM ET Ends In: 10 days Event Details Offerors' Conference Documents Event Details Event ID Event Type Event Status Purchase Type Category Type Government Type Fiscal Year Agency Site Show Details --> PE-66062-NONST-2027-000000440 Non-State Agency Open Non-State Agency Construction / Public Works city 2027 66062 ATLANTA, CITY OF Buyer Contact: Bonnie Davis bdavis@atlantaga.gov 404-327-1625 --> Description This project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT standards and specifications. NIGP Codes Code
Excerpt
EXHIBIT – A GENERAL SCOPE OF SERVICES GROUP – 3 SCOPE OF WORK, SCHEDULE OF QUANTITIES, AND PRICES – Group 3 1.0 SCOPE OF WORK The scope of work for this project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT standards and specifications. The quantities of the improvements are listed on the bid for pricing. Project List attached along with mix type and spread rate. On Street Quad From Street To Street Mix Type Spread Rate BENJAMIN E MAYS DRIVE SW FAIRBURN ROAD CASCADE ROAD 12.5MM 220 GREENBRIAR PARKWAY SW CAMPBELLTON ROAD CONTINETAL COLONY PARKWAY 12.5MM 220 LAKEWOOD AVENUE SE MACON DRIVE CLAIRE DRIVE 12.5MM 220 Variable depth Milling of 1½ inches to 2 inches of existing pavement and overlay with 1½ inches to 2 inches of 12.5mm (as noted on the attached, but not limited to this project list) with point patching and levelling performed as needed to prevent water accumulation on pavement, restore proper grade and / or transverse slope for positive drainage. The CONTRACTOR will need to make safe any utilities exposed as a result of deep patching / milling as directed by the Engineer. 2.0 MILESTONES AND LIQUIDATED DAMAGES Contractor shall complete the work in accordance with the milestones set forth in Exhibit A.3 of the Agreement. Time is of the essence under this Agreement.
Attachments
Id
50294167
Name
EXHIBIT A_ Scope of Work 2025 LMIG Group 3_04.pdf
Contact Name
Bonnie Davis
Description
This project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT standards and specifications.
Category Type
Construction / Public Works
Contact Email
bdavis@atlantaga.gov
Contact Phone
(404) 327-1625
Status
Open
Listing
Title
IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3
Status
Open
Approval
A
Ending In
10 days
Noia Days
0
Source Id
gpr20
E Source Id
gpr20
Agency Code
66062
Agency Name
Atlanta, City Of
Sole Source
No
Closing Date
Aug 3, 2026
Posting Date
Jul 2, 2026
Electronic Bid
No
Esource Number
PE-66062-NONST-2027-000000440
Financial Year
2027
Bid Process Type
Non-State Agency
Closing Date Str
Aug 03, 2026 @ 02:00 PM
Government Type
city
Posting Date Str
Jul 02, 2026 @ 03:26 PM
Closing Date Sort
1785780000000
Posting Date Sort
1783020374000
Esource Number Key
PE-66062-NONST-2027-000000440
Tooltip Closing Date
Aug 03, 2026 @ 02:00 PM
Tooltip Posting Date
Jul 02, 2026 @ 03:26 PM
Enriched
Yes
Closing Ms
1785780000000
Posting Ms
1783020374000
Agency Name
Atlanta, City Of
Category Label
All Categories
Esource Number
PE-66062-NONST-2027-000000440
Government Type
city
Source System Type
gpr20

Source: Georgia Procurement Registry (solicitation GEORGIA-PE-66062-NONST-2027-000000440), retrieved via the Georgia Procurement Registry (DOAS). View the official posting — always confirm requirements and deadlines with the issuing agency.