Effingham County is soliciting the construction of a new 1.5-million-gallon concrete composite elevated water tank as part of the County's Regional Water Supply Facilities project. The project includes all labor, materials, and equipment necessary to provide a complete and fully operational elevated water storage facility, including the tank foundation, tank erection, site work, piping, painting, electrical systems, instrumentation, SCADA, and related accessories.
Major construction components include the elevated tank and foundation, site clearing and grading, gravel access areas, approximately 12-inch PVC water main, flanged piping and control valves, connection to the existing 16-inch water main, fire hydrant assemblies, gate valves, steel casing/jack-and-bore work, chain-link fencing and gates, rip-rap, miscellaneous concrete, erosion and sediment controls, and site restoration.
The project also includes a complete electrical, instrumentation, and SCADA system, including electrical service, panels, conduit, wiring, gauges, controls, grounding, lighting, pressure instrumentation, and associated testing and inspections. The electrical plans further identify SCADA equipment, tank lighting, grounding around the tank, service equipment, and provisions for obstruction lighting if required for FAA compliance. Additional work includes tank coating and painting, lettering and logo installation, disinfection and bacteriological testing of the water system, stormwater/NPDES monitoring and reporting, and completion of all regulatory and closeout requirements necessary to place the facility into service.
The project includes all labor, materials, and equipment necessary to provide a complete and fully operational elevated water storage facility, including the tank foundation, tank erection, site work, piping, painting, electrical systems, instrumentation, SCADA, and related accessories. Major construction components include the elevated tank and foundation, site clearing and grading, gravel access areas, approximately 12-inch PVC water main, flanged piping and control valves, connection to the existing 16-inch water main, fire hydrant assemblies, gate valves, steel casing/jack-and-bore work, chain-link fencing and gates, rip-rap, miscellaneous concrete, erosion and sediment controls, and site restoration. The project also includes a complete electrical, instrumentation, and SCADA system, including electrical service, panels, conduit, wiring, gauges, controls, grounding, lighting, pressure instrumentation, and associated testing and inspections. The electrical plans further identify SCADA equipment, tank lighting, grounding around the tank, service equipment, and provisions for obstruction lighting if required for FAA compliance. Additional work includes tank coating and painting, lettering and logo installation, disinfection and bacteriological testing of the water system, stormwater/NPDES monitoring and reporting, and completion of all regulatory and closeout requirements necessary to place the facility into service.
We post new general contractors opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Georgia work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-65100-NONST-2027-000000057), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.