The City of Marietta wishes to remove an existing triple (42") culvert drain passing under Burriss Park main trail, replacing it with a 60' prefabricated bridge. The Scope of Work includes but is not limited to the removal of the existing culverts, headwalls, trail surface, trees, etc. Project includes the construction of bridge abutments, improvements to the stream bank and the installation of the prefabricated vehicular rated bridge. The bridge will be furnished to the site by the city. The general contractor will be required to coordinate all their work with delivery of the bridge.
REQUEST FOR BIDS
Burruss Park Bridge Construction
RFB 27-54218
CITY OF MARIETTA
PURCHASING DIVISION
205 Lawrence Street
Marietta, Georgia
30060
11/13/2026
2
TABLE OF CONTENTS
REQUEST FOR BID NO. RFB 27-54218
FOR
Burruss Park Bridge Construction
TITLE PAGE
INSTRUCTIONS TO BIDDER ..................................................................................................................................... 3
NOTICE TO CONTRACTORS ................................................................................................................................... 10
SECTION 1 – BID DOCUMENTS ............................................................................................................................. 12
BID PROPOSAL ..................................................................................................................................................... 12
BID BOND............................................................................................................................................................. 15
NON-COLLUSION AFFIDAVIT OF PRIME BIDDER .................................................................................................... 18
REFERENCES......................................................................................................................................................... 20
100% PERFORMANCE BOND ................................................................................................................................ 21
110% LABOR AND MATERIAL PAYMENT BOND .................................................................................................... 24
CERTIFICATION BY CONTRACTOR REGARDING NON-SEGREGATED FACILITIES .....................................................
The project includes the removal of existing culverts, headwalls, trail surface, and trees; construction of bridge abutments; improvements to the stream bank; and installation of a prefabricated vehicular-rated bridge. The bridge will be furnished to the site by the city, and the general contractor is required to coordinate all work with the delivery of the bridge. No roadway paving or roadway improvement work is included. Temporary lane closures or roadway blockages associated with bridge delivery and unloading require prior approval.
We post new structural work opportunities in Georgia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Georgia Procurement Registry (solicitation PE-63363-NONST-2027-000000034), retrieved via the Georgia Procurement Registry (DOAS). View the official posting, and always confirm requirements and deadlines with the issuing agency.