Generator Replacement for Quillayute Airport (UIL) This is a commercial construction requirement set aside 100% for Small Businesses utilizing LPTA procedures. Subject to DBA Wage Determination Please see all attachments related to this RFQ. Instructions can be found in Section 6 of the RFQ with corresponding Evaluation criteria found in Section 7. If submission does not meet the exact instruction requirements, the quoter will be found non-responsive.
Solicitation — DOC - NOAA - WAD / WAD-NWS
PSC N056 · NAICS 238290 · Ref 1305M327Q0009
The contractor shall provide all labor, material, equipment, supervision and transportation necessary for the installation of an emergency standby generator/ATS and relocation of a propane tank. Work includes verifying measurements, obtaining permits, identifying buried utilities, pouring rebar reinforced concrete pads for the generator and propane tank, trenching and power feed, installing a load center transfer switch in a NEMA 3R enclosure, relocating the existing propane tank, installing the generator, and verifying operation. The generator must be 50KW, liquid propane, 120/240 VAC, 60 Hz, single phase, with an enclosure suitable for exterior coastal conditions.
We post new generators opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: DOC - NOAA - WAD (solicitation 1305M327Q0009), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.