Proposal: T2B08
County: Columbia
Major Work Type: Resurfacing
Bid Due: October 28, 2026
Notice (BSN): T2B08BSN.pdf
Plan & Proposal Holders (CPP) — amendments must be downloaded from CPP Online Ordering per FDOT amendment instructions.
Florida Department of Transportation
Bid Solicitation Notice and Approximate Quantities
Letting: CT261028 Call Order: 011 Proposal: T2B08 District:02
Counties: COLUMBIA
Road Name:
Limits:
SR 247 (BRANFORD HWY)
FROM SUWANNEE COUNTY LINE TO SR 93 (I-75)
Project(s): 20841195201(*) Federal Aid No: D226050B
Total Roadway Length: 10.029 Miles Contract Days: 180
Total Bridge Length: 0.045 Miles Letting Date: 10/28/26
Total Proposal Length: 10.074 Miles Contract Execution Days: 10
Special Start Date: N/A
Aquis/Flexible Start Time: 15 Days
Proposal Budget Estimate: $8,714,075.00
Please read the full advertisement
Description:
The Improvements under this Contract consist of milling and resurfacing, shoulder treatment, drainage improvements, highway
signing, guardrail, and other incidental construction on SR 247 in Columbia County from the Suwannee County Line to I-75 (SR
93).
Call Order: 011 Proposal: T2B08
ALT Item Description Unit Quantity
Section 0001 Roadway
0101- 1- MOBILIZATION (20841195201) LS 1.000
0102- 1- MAINTENANCE OF TRAFFIC (20841195201) LS 1.000
0102- 3- COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY
MAINTENANCE
CY 10.000
0102- 14- TRAFFIC CONTROL OFFICER HR 728.000
0102- 60- WORK ZONE SIGN ED 18,180.000
0102- 71- 15 TEMPORARY BARRIER, F&I, ANCHORED LF 235.000
0102- 71- 25 TEMPORARY BARRIER, RELOCATE, ANCHORED LF 223.000
0102- 74- 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD ED 157,072.000
0102- 78- 1 TEMPORARY RAISED/RETROREFLECTIVE PAVEMENT MARKER,
TYPE D
EA 5,794.000
0102- 89- 1 TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION LO 4.000
0102- 99- PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 388.000
0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 540.000
0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE,
INTERSECTION
ED 360.000…
The work consists of milling and resurfacing, shoulder treatment, drainage improvements, highway signing, guardrail, and other incidental construction on SR 247 in Columbia County from the Suwannee County Line to I-75 (SR 93). The project includes approximately 10.074 miles of roadway, with 0.045 miles of bridge. Specific items include mobilization, maintenance of traffic, traffic control officers, work zone signs, temporary barriers, channelizing devices, temporary pavement markers, temporary crash cushions, portable changeable message signs, temporary signalization, clearing and grubbing, optional base, milling existing asphalt pavement, superpave asphaltic concrete, asphalt concrete friction course, pipe culvert, mitered end sections, bridge deck expansion joint rehabilitation, concrete ditch pavement, riprap, guardrail, guardrail removal, guardrail end treatments, performance turf sod, shoulder drop off soil, painted pavement markings, ground-in rumble strips, single column ground sign assemblies, retroreflective sign strips, object markers, raised pavement markers, thermoplastic pavement markings, permanent tape, conduit, pull and splice boxes, vehicular signal auxiliaries, and loop assemblies.
We post new asphalt opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Florida Department of Transportation (solicitation 2026-T2B08), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.