Proposal: T2A71
County: Levy
Major Work Type: Resurfacing
Bid Due: December 2, 2026
Notice (BSN): T2A71BSN.pdf
Plan & Proposal Holders (CPP) — amendments must be downloaded from CPP Online Ordering per FDOT amendment instructions.
Florida Department of Transportation
Bid Solicitation Notice and Approximate Quantities
Letting: CT261202 Call Order: 006 Proposal: T2A71 District:02
Counties:
Road Name:
Limits:
LEVY
SR 320 (NW 115TH ST)
FROM MANATEE SPRINGS STATE PARK TO SR 55 (US 19)
Project(s): 21029235201(*) Federal Aid No: D226057B
Total Roadway Length: 5.743 Miles Contract Days: 150
Total Bridge Length: 0.000 Miles Letting Date: 12/02/26
Total Proposal Length: 5.743 Miles Contract Execution Days: 10
Special Start Date: N/A
Aquis/Flexible Start Time: 15 Days
Proposal Budget Estimate: $3,355,051.00
Please read the full advertisement
Description:
The Improvements under this Contract consist of milling & resurfacing, base work, shoulder treatment, drainage improvements,
highway signing, and other incidental construction on SR 320/NW 115th Street in Levy County from Manatee Springs State Park
to SR 55 (US 19).
Call Order: 006 Proposal: T2A71
ALT Item Description Unit Quantity
Section 0001 Roadway
0101- 1- MOBILIZATION (21029235201) LS 1.000
0102- 1- MAINTENANCE OF TRAFFIC (21029235201) LS 1.000
0102- 60- WORK ZONE SIGN ED 14,850.000
0102- 61- BUSINESS SIGN EA 5.000
0102- 74- 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD ED 9,712.000
0102- 78- 2 TEMPORARY RAISED/RETROREFLECTIVE PAVEMENT MARKER,
TYPE B
EA 902.000
0102- 99- PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 628.000
0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 150.000
0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE,
INTERSECTION
ED 150.000
0102-909- TEMPORARY RAISED RUMBLE STRIPS- PER DAY, INCLUDES ALL
SETS AND RELOCATIONS
DA 1,080.000
0104- 10- 3 SEDIMENT BARRIER LF 3,002.000
0104- 18- INLET PROTECTION SYSTEM EA 6.000
0107- 1- LITTER REMOVAL AC 201.870
0107- 2- MOWING AC 153.150
0110- 1- 1 CLEARING &…
The improvements consist of milling and resurfacing, base work including optional base and Type B stabilization, shoulder treatment including shoulder drop-off soil and performance turf sod, drainage improvements, highway signing including ground sign assemblies and rumble strips, maintenance of traffic, litter removal and mowing, and painted and thermoplastic pavement markings over 5.743 miles on SR 320/NW 115th Street from Manatee Springs State Park to SR 55 (US 19).
We post new asphalt opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Florida work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Florida Department of Transportation (solicitation 2026-T2A71), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.