BI-MH-139-CMR-2, GBCMHC - Sprinkler System and Related Renovations, 1635 Central Avenue, Bridgeport CT. The Greater Bridgeport Community Mental Health Center (GBCMHC) is an 8-story mental health facility approximately 144,000 sq. ft. that has roughly 100 in-patients residing within the building full-time as well as out-patient services. GBCMHC provides mental health treatment, food services, administration offices, conference rooms and a pharmacy for its clients.
It is a high-rise building, and as such, is required to have an approved working sprinkler system per the Joint Commission which adopted the NFPA Code 101® 2012 edition of the Life Safety Code as well as the NFPA 99® 2012 edition of the Health Care Facilities Code. All work must comply with ASHRAE 170, NFPA 99, and JC EC 02.05.01
The building will remain occupied during construction; the work will be phased and carefully coordinated with facility stakeholders to minimize disruptions. See the RFQ for full details.
The project involves installing an approved working sprinkler system in an 8-story, 144,000 sq. ft. mental health facility that houses approximately 100 in-patients and provides out-patient services, food services, administration offices, conference rooms, and a pharmacy. The building will remain occupied during construction, requiring phased work and careful coordination with facility stakeholders. All work must comply with ASHRAE 170, NFPA 99, and JC EC 02.05.01.
We post new life safety opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Y""BI-MH-139_90 percent CD Phase Project Manual.pdf"1793972922000179397292200019856241793972922000"Y"114930017344404"application/pdf"1985624"ORG""BI-MH-139_90 percent CD Phase Project Manual.pdf""Y""1212 QBS Submittal Booklet Instructions 03.31.2026.pdf"1793971342000179397134200019855791793971342000"Y"1149300308047"application/pdf"1985579"ORG""1212 QBS Submittal Booklet Instructions 03.31.2026.pdf""Y""BI-MH-139_90 percent CD Phase Drawings.pdf"1793972906000179397290600019856231793972906000"Y"114930038091799"application/pdf"1985623"ORG""BI-MH-139_90 percent CD Phase Drawings.pdf""Y""BI-MH-139-CMR-2 1700 CMR RFQ Web Advertisement 11.06.2026.pdf"1793971343000179397134300019855801793971343000"Y"1149300249544"application/pdf"1985580"ORG""BI-MH-139-CMR-2 1700 CMR RFQ Web Advertisement 11.06.2026.pdf""Y""BI-MH-139_90 percent CD Phase Narrative Report.pdf"1793972902000179397290200019856221793972902000"Y"11493008409009"application/pdf"1985622"ORG""BI-MH-139_90 percent CD Phase Narrative Report.pdf"1149300111493005Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of Connecticut (CTsource) (bid 146703), retrieved via the CT DAS CTsource BidBoard (WebProcure). View the official posting, and always confirm requirements and deadlines with the issuing agency.