The Town of Cheshire is seeking bids from qualified contractors for performing work associated with
the replacement of an existing pavilion structure at Mixville Park in Cheshire, Connecticut. The work
includes, but is not limited to, demolition of the existing pavilion structure, foundations, asphalt
pad, and adjacent sidewalks; construction of a new pre-engineered pavilion structure with
reinforced concrete footings, slab, and sidewalks; installation of associated electrical improvements,
and restoration of disturbed areas, including loam and seed.
The work includes, but is not limited to, demolition of the existing pavilion structure, foundations, asphalt pad, and adjacent sidewalks; construction of a new pre-engineered pavilion structure with reinforced concrete footings, slab, and sidewalks; installation of associated electrical improvements, and restoration of disturbed areas, including loam and seed.
We post new concrete opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"N""ITB 2627-04_ADDENDUM NO1.pdf"1791993932000179199393200019723601791993932000"Y"1149300316753"application/pdf"1972360"ORG""ITB 2627-04_ADDENDUM NO1.pdf""Y""ITB 2627-04_Pavilion_FINAL_.pdf"1791903722000179190372200019716771791903722000"Y"11493004076373"application/pdf"1971677"ORG""ITB 2627-04_Pavilion_FINAL_.pdf""Y""Pavilion at Mixville Park.pdf"1791908240000179190824000019717711791908240000"Y"11493007602883"application/pdf"1971771"ORG""Pavilion at Mixville Park.pdf""N""VendorChangeDetailsReport_39403_v2_Oct_14_26.pdf"1791994152000179199415200019723761791994152000"Y"11493002326"application/pdf"1972376"ORG""VendorChangeDetailsReport_39403_v2_Oct_14_26.pdf""N""BuyerChangeDetailsReport_39403_v2_Oct_14_26.pdf"1791994152000179199415200019723751791994152000"Y"11493002326"application/pdf"1972375"ORG""BuyerChangeDetailsReport_39403_v2_Oct_14_26.pdf"1149300111493005Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Required by the city at the permit stage, not with your bid. Inferred from where the work happens — confirm forms and amounts with the permit office before you start.