The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT.
THE WORK CONSISTS OF: The Contractor shall furnish all necessary materials, equipment, and labor required to construct and commission a new power system for the Dike B Operator unit. The scope of work involves comprehensive site preparation to support the construction of a reinforced concrete generator pad and the installation of secure perimeter fencing. The Contractor is responsible for the procurement and installation of a standalone, propane-powered generator and a corresponding propane fuel storage tank. Following the physical installation, the Contractor shall execute all final electrical connections and integration into the existing sluice gate operator unit and control panel. All work shall comply with all applicable federal laws and codes, and shall be completed in accordance with the Statement of Work.
This procurement is set-aside for small business vendors. The applicable NAICS code is 238290 with a Small Business Size Standard of $22 Million.
ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE.
The Contractor shall furnish all materials, equipment, and labor to construct and commission a new power system for the Dike B Operator unit, including site preparation for a reinforced concrete generator pad, installation of secure perimeter chain-link fencing, procurement and installation of a standalone propane-powered generator and propane fuel storage tank, and final electrical connections integrating the generator into the existing sluice gate operator unit and control panel, in accordance with the Statement of Work and all applicable federal laws and codes.
We post new concrete opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"01742-2751""CONCORD""MA""USA""KO CONTRACTING DIVISION""696 VIRGINIA ROAD""Attachments 27QA001.pdf"2096289"file"".pdf""1""2026-10-15T17:40:59.171+00:00""cff7c3f38ac247fa892ee7d1f3914ffd""public""0""public""5274b21071c94bf2b862b0b8d3bdfb1f""0"3"0""Solicitation Survey 27QA001.pdf"260271"file"".pdf""1""2026-10-15T17:40:59.171+00:00""2833cadfe7a140289316a235306ba8c7""public""0""public""e87a7dab7e914e7ca60ce68af59bd286""0"2"0""Solicitation W912WJ27QA001.pdf"4588762"file"".pdf""1""2026-10-15T17:40:59.171+00:00""f57ec57305ac40fea4a0332b86ffeb8c""public""0""public""5195660325bc49d89afbc357fbb53603""0"1"0"Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 344d4cd3778e45bc94672cbdff6938b0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.