Replace two air handling units and associated hot water heating coils at Brookfield Library.
Replace outdoor air-cooled condensing units, refrigerant piping, and heating hot water piping.
Provide the electrical power work per the engineer's specifications.
Attend the mandatory pre-bid meeting and submit a sealed bid by the due date.
Posted Scope of Work
The Town of Brookfield (the Town) is seeking sealed bid proposals from qualified contractors to replace HVAC equipment at the Brookfield Library, as detailed in the engineer’s specifications ‘2026-08-10 BTL HVAC Reno.pdf’ posted separately to this invitation to bid. The project consists of replacing two existing air handling units and associated external hot water heating coils, outdoor air-cooled condensing units, refrigerant piping, heating hot water piping, and electrical power.
Scope, read from the documentsAI-generated
Replace two existing air handling units and associated external hot water heating coils, outdoor air-cooled condensing units, refrigerant piping, heating hot water piping, and electrical power, as detailed in the engineer's specifications.
Yes, a mandatory pre-bid meeting is on Thursday, October 15th, 2026, at 10:00 AM at Brookfield Library, 182 Whisconier Road, Brookfield, CT.
What is the work?
Replacing two air handling units and associated hot water heating coils, air-cooled condensing units, refrigerant piping, heating hot water piping, and electrical power at the Brookfield Library.
Who can respond and who do I contact?
All vendors may respond. Contact Julian Capadose at 203-775-7323 or purchasing@brookfieldct.gov.
Full source recordEvery field State of Connecticut (CTsource) published, untouched
Julian Capadose
100 Pocono Road Brookfield CT, 06804 United States
Tel: 203-775-7323
Fax:
purchasing@brookfieldct.gov
Bid Workflow
Bidid
146145
Pa Workflow
0
Pi Workflow
1
For Est Total Pa
0
For Est Total Pi
0
Infor Est Total Pa
0
Infor Est Total Pi
0
Addendum Workflow
0
Pa Workflow Status
0
Pi Workflow Status
3
For Est Total Addendum
0
Infor Est Total Addendum
0
Addendum Workflow Status
0
Ct Bidstatus
Name
Started
Status
2
D Status
Active
Public Status
Open
Description
The Town of Brookfield (the Town) is seeking sealed bid proposals from qualified contractors to replace HVAC equipment at the Brookfield Library, as detailed in the engineer’s specifications ‘2026-08-10 BTL HVAC Reno.pdf’ posted separately to this invitation to bid.
The project consists of replacing two existing air handling units and associated external hot water heating coils, outdoor air-cooled condensing units, refrigerant piping, heating hot water piping, and electrical power.
Has Addendums
No
Prtcp End Date
1791468021000
Bid Header Cats
Id
Bidid
146145
Catid
1163364
Cat Item
Cow
Y
Nic
72151200
Name
Heating and cooling and air conditioning HVAC construction and maintenance services
Catid
1163364
Mcatid
15592
Owner Oid
149300
Cow Leader
1163364
Description
Heating and cooling and air conditioning HVAC construction and maintenance services
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? Get prequalified once.
Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
Prequalified contractors know they can be bonded before they write the bid — and skip the application on every one of these. The bond becomes a request form and a copy of the RFP, not a scramble at the deadline.Prequalify For Bonding →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: State of Connecticut (CTsource) (bid 146145), retrieved via the CT DAS CTsource BidBoard (WebProcure). View the official posting, and always confirm requirements and deadlines with the issuing agency.