The installation of two interconnection stations to connect the Cromwell Fire District, Water Division system to neighboring public water systems. Work includes but is not necessarily limited to the installation of subgrade concrete foundation; furnishing and installing the prefabricated bodies of two interconnection stations; installing approximately 2,060-feet of inch ductile iron water main via open trench; hanging approximately 170 feet of insulated 12-inch ductile iron water main at a bridge crossing and structural appurtenances; water main connections; gate valves; hydrants; backfill material; CTDOT road restoration; surface restoration; loaming and seeding; and all necessary and incidental appurtenances to complete the installation.
Electronic Bids for the Emergency Interconnections Project, Cromwell, CT, project will be received until 12:00 PM prevailing time on Friday, November 6, 2026. All bids shall be submi
Work includes installation of subgrade concrete foundation; furnishing and installing prefabricated bodies of two interconnection stations; installing approximately 2,060 feet of ductile iron water main via open trench; hanging approximately 170 feet of insulated 12-inch ductile iron water main at a bridge crossing and structural appurtenances; water main connections; gate valves; hydrants; backfill material; CTDOT road restoration; surface restoration; loaming and seeding; and all necessary and incidental appurtenances to complete the installation.
We post new excavating opportunities in Connecticut as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Y""HeavyRates_7-1-2026.pdf"1790704594000179070459400019653711790704594000"Y"11493001763117"application/pdf"1965371"ORG""HeavyRates_7-1-2026.pdf""Y""Sept 22 2026_Cromwell IC_Project Plans.pdf"1790600600000179060060000019639831790600600000"Y"114930028940707"application/pdf"1963983"ORG""Sept 22 2026_Cromwell IC_Project Plans.pdf""Y""Sept 22 2026 App J East Street Connection.pdf"1790600635000179060063500019639851790600635000"Y"1149300285273"application/pdf"1963985"ORG""Sept 22 2026 App J East Street Connection.pdf""Y""Sept 22 2026_Cromwell IC_ProjectManual.pdf"1790694716000179069471600019652121790694716000"Y"114930016627112"application/pdf"1965212"ORG""Sept 22 2026_Cromwell IC_ProjectManual.pdf""N""Sept 29 2026_Cromwell IC_ProjectManual.pdf"1791312049000179131204900019683841791312049000"Y"114930017490184"application/pdf"1968384"ORG""Sept 29 2026_Cromwell IC_ProjectManual.pdf""N""BuyerChangeDetailsReport_39202_v2_Oct_6_26.pdf"1791312787000179131278700019684081791312787000"Y"11493002354"application/pdf"1968408"ORG""BuyerChangeDetailsReport_39202_v2_Oct_6_26.pdf""N""VendorChangeDetailsReport_39202_v2_Oct_6_26.pdf"1791312787000179131278700019684091791312787000"Y"11493002354"application/pdf"1968409"ORG""VendorChangeDetailsReport_39202_v2_Oct_6_26.pdf"2164435{"name":"linear foot","unit":34,"abbrev":"LF"}"1c"019"N""N"0197014611082868311460002238062164434{"name":"linear foot","unit":34,"abbrev":"LF"}"1b"019"N""N"0192014611082868311459992238062164432{"name":"lump sum","unit":860,"abbrev":"LS"}"1d"019"N""N"019114611082868311460012238062164433{"name":"linear foot","unit":34,"abbrev":"LF"}"1a"019"N""N"019197014611082868311459982238061149300111493005Most Connecticut work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: State of Connecticut (CTsource) (bid 146110), retrieved via the CT DAS CTsource BidBoard (WebProcure). View the official posting, and always confirm requirements and deadlines with the issuing agency.