James M Robb SP Island Acres Wastewater Improvements, C26CR1
The project consists of the removal and replacement of the existing submersible pump lift station with a new above ground lift station, removal and replacement of aeration basin liners and evaporation lagoon liners, and associated site work. The base bid includes 23 line items such as mobilization, construction surveying, demolition and site preparation, construction access improvements, removal and replacement of a 5-ft fiberglass wet well, furnishing and installing a new above ground lift station with bypass piping, a new sewage grinder with controller, sludge removal and disposal, topsoil stripping and stockpiling, cobble salvage and placement, excavation and placement at a proposed berm location, excavation and haul-off of excess topsoil, import and installation of liner bedding material, installation of new liners for the aeration basin and evaporation lagoon, cattail plantings, site restoration, and time & equipment items for an excavator, grader, loader, tandem dump truck, skid steer loader, and laborer.
We post new plumbing opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: DNR - Division of Parks & Wildlife (solicitation IFB1-PMAA-2027000045-1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.