PKAA, Double Dick Underground Mine Fire Mitigation Project
11/20/26 IFB1 PKAA 2027*0055 is posted to VSS. See attachments tab for links to associated documents.
Project work will extinguish the underground mine fire through excavation, blending, and backfilling of materials within a 10-acre excavation area, including simultaneous cutoff trenches, excavation of approximately 490,000 cubic yards of overburden and 130,000 cubic yards of burning coal, blending at 3.5:1, cooling below 80 degrees Fahrenheit, backfilling in 18-inch lifts, installing an aluminum box culvert, maintaining access roads, dust and ash control, 4,420 feet of S-fence, 16 acres of vegetation removal, topsoil salvage and stockpiling, 20,000 gallons of fire-suppression water storage, GPS geomorphic regrade to final elevations, distribution of wood chips, surface roughening, fertilizer, hydroseeding with soil amendments and hydro-mulch across 16 acres, and 5,000 feet of excelsior wattles.
We post new environmental & testing services opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: DNR - Division of Reclamation Mining & Safety (solicitation IFB1-PKAA-2027000055-1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.