LCC 27-1 Repair Roof & Ceiling, Indoor Arena & Stalls
See attached detailed specifications, Bid form and other documents.
The project consists of the removal and disposal of the existing metal roofing and deteriorated insulation and vapor barrier from a pre-engineered metal building. Installation of new standing seam metal roofing, insulation and vapor barrier to meet current building code and energy code requirements. The base bid scope of work is limited to those areas indicated on the drawings. The project has three additive alternates which address additional areas of work as indicated on the drawings. The contractor shall include a set quantity of anticipated weather days in their base bid as defined in the project manual. The project includes an allowance to be included within the Base Bid for the potential immediate replacement of moisture saturated rigid roofing insulation assemblies found within areas of partial roof replacement associated with Add Alternates 2 & 3.
We post new roofing opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Lamar Community College (solicitation IFB1-GJFA-2027000028-3), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.